Hoot Lake Battery Energy Storage System (MISO-E0005) — Project Summary

Queue ID
MISO-E0005
Capacity
90.72 MW
Technology
Battery
Status
active
Location
Otter Tail, MN
Region
MISO
Developer
Otter Tail Power Company
IA Status
In Progress (unknown study)

Hoot Lake Battery Energy Storage System

MISO-E0005BetaActiveBatteryMISOLBNL

90.72 MW storage in Otter Tail, MN · In queue since August 2025 · Proposed COD May 2028

BA: MISOISO/RTO: MISONERC: MRORC: MISO

90.72 MW

Capacity

1

Components

Battery

1y 3m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 9m

Study Phase

ERAS Study Cycle 1

In Study38%
Queue EntryAug 6, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-05-04

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Hoot Lake Battery Energy Storage System is a proposed battery energy storage development project in Otter Tail County, Minnesota. It is being developed by Otter Tail Power Company, which is also the associated utility. The project has a total capacity of 90.72 MW, entirely from battery storage. It would interconnect at the Hoot Lake 115 kV Substation.

The project is listed in the Midcontinent Independent System Operator (MISO) interconnection queue under queue ID MISO-E0005, with a queue entry date of August 6, 2025. Its status is active, and it is being evaluated in ERAS Study Cycle 1. The project has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement status is listed as in progress, with the specific study stage unknown. The proposed commercial operation date is May 4, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MN

County

Otter Tail

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Otter Tail Power Company

Utility

Otter Tail Power Company

Entity

MISO

Service Type

NRIS

Point of Interconnection

Hoot Lake 115 kV Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
MINN.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.