Project MISO-APP-100259 — Project Summary

Queue ID
MISO-APP-100259
Capacity
507.6 MW
Technology
Solar+Battery
Status
active
Location
Livingston Parish, LA
Region
MISO
Developer
NextEra Energy Capital Holdings Inc
IA Status
In Progress (unknown study)

MISO-APP-100259

MISO-APP-100259BetaActiveSolarBatteryMISOLBNL

507.6 MW hybrid in Livingston Parish, LA · In queue since December 2025 · Proposed COD June 2028

BA: MISOISO/RTO: MISONERC: SERCRC: MISO

507.6 MW

Capacity

1

Components

Solar

11 months

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 6m

In Study38%
Queue EntryDec 19, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2028
From queue filing
Developer in saved assessment
NextEra Energy
From queue filing
Status at research time
Active
Active in MISO queue (filed 2025-12-19); interconnection agreement study in progress, no IA executed; no public construction signals found.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL snapshot provides a COD (proposed_cod 2028-06-30); no news or live search findings were available to corroborate or contradict it.

Developer: The LBNL filing names NextEra Energy Capital Holdings Inc, a NextEra Energy subsidiary. No external sources were available to confirm the operating developer or any ownership change.

Status: LBNL lists status as active with IA in progress and is_operational false. No newer sources contradict this.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

MISO-APP-100259 is a proposed hybrid solar and battery storage development project located in Livingston Parish, Louisiana. The project is being developed by NextEra Energy Capital Holdings Inc and has a total capacity of 507.6 MW. Although the project is classified as a Solar+Battery hybrid, the available component data lists only a solar component of 507.6 MW. No separate capacity figure is provided for the battery storage portion. The project would interconnect at the Williow Glenn to Coly 500 kV point of interconnection.

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on December 19, 2025. It currently holds active status and has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement status is listed as in progress, although the specific study phase is not identified. The proposed commercial operation date is June 30, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

LA

County

Livingston Parish

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

NextEra Energy Capital Holdings Inc

Utility

—

Entity

MISO

Service Type

NRIS

Point of Interconnection

Williow Glenn to Coly 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
LOUISIANA.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.