Sandcut Storage (MISO-APP-100248) — Project Summary

Queue ID
MISO-APP-100248
Capacity
279.72 MW
Technology
Solar+Battery
Status
active
Location
Vigo, IN
Region
MISO
Developer
Hoosier Energy / Solvenz
IA Status
In Progress (unknown study)

Sandcut Storage

MISO-APP-100248BetaActiveSolarBatteryMISOLBNL

279.72 MW hybrid in Vigo, IN · In queue since December 2025 · Proposed COD June 2028

BA: MISOISO/RTO: MISONERC: RFCRC: MISO

279.72 MW

Capacity

1

Components

Solar

11 months

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 6m

In Study38%
Queue EntryDec 22, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-06-30

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2028
From queue filing
Developer in saved assessment
Hoosier Energy / Solvenz
From queue filing
Status at research time
Active
Active — In Progress interconnection study phase, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedDec 22, 2025Latest in this assessment

Project entered MISO queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of June 2028. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL lists joint development between Hoosier Energy (rural electric cooperative) and Solvenz. No news coverage found to identify if filing entity differs from operating entities or to clarify partnership structure.

Status: LBNL shows active queue status with interconnection study in progress. No news coverage found to provide ground-truth updates on permitting, financing, or construction milestones.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sandcut Storage (queue ID MISO-APP-100248) is a proposed hybrid solar and battery storage development project in Vigo County, Indiana. Hoosier Energy and Solvenz are developing it, and Hoosier Energy is listed as the associated utility. The project has a total capacity of 279.72 MW. The available component data lists the solar portion at 279.72 MW, and no separate capacity figure is provided for the battery component.

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO), which it entered on December 22, 2025, and its queue status is active. It has requested Network Resource Interconnection Service (NRIS) and proposes to connect at the Wabash River - Whitesville South 230 kV point of interconnection. Its interconnection agreement status is listed as in progress, with the specific study phase unknown. The proposed commercial operation date is June 30, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IN

County

Vigo

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Hoosier Energy / Solvenz

Utility

Hoosier Energy

Entity

MISO

Service Type

NRIS

Point of Interconnection

Wabash River - Whitesville South 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
INDIANA.HUB
Hub Confidence
HIGH
POI Substation
South

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Sandcut Storage
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.