Merom Storage (MISO-APP-100245) — Project Summary

Queue ID
MISO-APP-100245
Capacity
405 MW
Technology
Solar+Battery
Status
active
Location
Sullivan, IN
Region
MISO
Developer
Hoosier Energy / Solvenz
IA Status
In Progress (unknown study)

Merom Storage

MISO-APP-100245BetaActiveSolarBatteryMISOLBNL

405 MW hybrid in Sullivan, IN · In queue since December 2025 · Proposed COD August 2028

BA: MISOISO/RTO: MISONERC: RFCRC: MISO

405 MW

Capacity

1

Components

Solar

11 months

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 8m

In Study38%
Queue EntryDec 19, 2025

Interconnection request submitted to ISO/RTO

DPP StudyCurrent

MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.

Typical: 30–40 months (historical); 12 months target

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-05

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 5, 2028
From queue filing
Developer in saved assessment
Hoosier Energy / Solvenz
From queue filing
Status at research time
Active
Active in LBNL (queue date 2025-12-19, IA in progress). Aggregator interconnection.fyi lists a 'Merom Storage' record (E0055) as Withdrawn, which may be a separate or superseded request. The MISO ERAS list (Sep 2025) shows a 400 MW, 4-hour BESS 'Not started'.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/projects/state/IN
  2. interconnection.fyi/projects/market/MISO
  3. cdn.misoenergy.org/ERAS%20Interconnection%20Requests718481.pdf?v=20250925100448
  4. wfyi.org/public-affairs/2022-02-21/hallador-energy-acquiring-1-gigawatt-indiana-power-plant
  5. rejournals.com/hoosier-energy-hallador-to-develop-up-to-1000mw-of-renewable-power-in-indiana/

Commercial operation date: No post-LBNL source gives a COD for Merom Storage. The MISO ERAS list (Sep 2025) shows the project as 'Not started' with no in-service date, so the LBNL proposed COD of 2028-08-05 is kept unverified.

Developer: Only the LBNL filing names the developer. Search results show Hallador Energy bought the adjacent Merom Generating Station from Hoosier Energy in 2022 and that the two planned joint renewables. None of them explicitly ties Hallador or Solvenz to this storage project, so no parent or ownership change is asserted.

Status: LBNL status is Active and the withdrawn aggregator entry carries a different queue ID (E0055 vs MISO-APP-100245), so it cannot be confirmed to be the same request. The Active status is kept but flagged as uncertain.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Merom Storage is a proposed hybrid solar and battery storage development project in Sullivan County, Indiana, with a total capacity of 405 megawatts (MW). The project is being developed by Hoosier Energy and Solvenz, with Hoosier Energy listed as the associated utility. Its component data lists a 405 MW solar component. A battery storage component is also identified, but its individual capacity is not specified. The project would connect to the grid at the Merom Storage Collector Sub 345kV point of interconnection.

The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO) under queue ID MISO-APP-100245. It entered the queue on December 19, 2025, and holds an active status. It has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement status is listed as in progress, though the specific study phase has not been identified. The proposed commercial operation date is August 5, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

IN

County

Sullivan

Grid Region

MISO (Midcontinent)

Market

ISO/RTO Member

Developer

Hoosier Energy / Solvenz

Utility

Hoosier Energy

Entity

MISO

Service Type

NRIS

Point of Interconnection

Merom Storage Collector Sub 345kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MISO
Trading Hub
INDIANA.HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.