Merom Storage
405 MW hybrid in Sullivan, IN · In queue since December 2025 · Proposed COD August 2028
405 MW
Capacity
1
Components
Solar
11 months
In Queue
In Progress (unknown study)
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
2y 8m
Interconnection request submitted to ISO/RTO
MISO uses the Definitive Planning Phase (DPP) process with 3 study phases.
Typical: 30–40 months (historical); 12 months target
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-08-05
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/projects/state/IN
- interconnection.fyi/projects/market/MISO
- cdn.misoenergy.org/ERAS%20Interconnection%20Requests718481.pdf?v=20250925100448
- wfyi.org/public-affairs/2022-02-21/hallador-energy-acquiring-1-gigawatt-indiana-power-plant
- rejournals.com/hoosier-energy-hallador-to-develop-up-to-1000mw-of-renewable-power-in-indiana/
Commercial operation date: No post-LBNL source gives a COD for Merom Storage. The MISO ERAS list (Sep 2025) shows the project as 'Not started' with no in-service date, so the LBNL proposed COD of 2028-08-05 is kept unverified.
Developer: Only the LBNL filing names the developer. Search results show Hallador Energy bought the adjacent Merom Generating Station from Hoosier Energy in 2022 and that the two planned joint renewables. None of them explicitly ties Hallador or Solvenz to this storage project, so no parent or ownership change is asserted.
Status: LBNL status is Active and the withdrawn aggregator entry carries a different queue ID (E0055 vs MISO-APP-100245), so it cannot be confirmed to be the same request. The Active status is kept but flagged as uncertain.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Merom Storage is a proposed hybrid solar and battery storage development project in Sullivan County, Indiana, with a total capacity of 405 megawatts (MW). The project is being developed by Hoosier Energy and Solvenz, with Hoosier Energy listed as the associated utility. Its component data lists a 405 MW solar component. A battery storage component is also identified, but its individual capacity is not specified. The project would connect to the grid at the Merom Storage Collector Sub 345kV point of interconnection.
The project is in the interconnection queue of the Midcontinent Independent System Operator (MISO) under queue ID MISO-APP-100245. It entered the queue on December 19, 2025, and holds an active status. It has requested Network Resource Interconnection Service (NRIS). Its interconnection agreement status is listed as in progress, though the specific study phase has not been identified. The proposed commercial operation date is August 5, 2028.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
IN
County
Sullivan
Grid Region
MISO (Midcontinent)
Market
ISO/RTO Member
Developer
Hoosier Energy / Solvenz
Utility
Hoosier Energy
Entity
MISO
Service Type
NRIS
Point of Interconnection
Merom Storage Collector Sub 345kV
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MISO
- Trading Hub
- INDIANA.HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Top 10 solar states
Data tables and metrics from the InfraSure database.
USS Gold Solar
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.