LGE-KU-LGE-CS2025-012
19 MW generation in Trimble, KY · In queue since December 2025 · Proposed COD May 2030
19 MW
Capacity
1
Components
Gas
11 months
In Queue
In Progress (unknown study)
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 5m
Study Phase
CS 2025
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-05-05
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Queue ID LGE-KU-LGE-CS2025-012 is a proposed natural gas-fired generation project in Trimble County, Kentucky, in the Southeast region of the United States. The development project has a total capacity of 19 MW and consists of a single gas component. It is listed in the interconnection queue administered by LGE-KU, the combined transmission entity of Louisville Gas & Electric and Kentucky Utilities Energy, which is identified as the associated utility. The project's proposed point of interconnection is the Trimble County Switching Station at 345 kV, designated as Unit #6.
The project entered the LGE-KU interconnection queue on December 18, 2025, and holds an active status. It has requested Network Resource Interconnection Service (NRIS) and is being evaluated in the CS 2025 study phase. Its interconnection agreement status is recorded as in progress, though the specific study stage is not identified. The proposed commercial operation date is May 5, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
KY
County
Trimble
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
NRIS
Point of Interconnection
Trimble County Switching Station, 345 kV (Unit #6)
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project LGE-KU-LGE-CS2025-012Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.