Project LGE-KU-LGE-CS2025-008 — Project Summary

Queue ID
LGE-KU-LGE-CS2025-008
Capacity
17 MW
Technology
Gas
Status
active
Location
Trimble, KY
Region
Southeast
Developer
—
IA Status
In Progress (unknown study)

LGE-KU-LGE-CS2025-008

LGE-KU-LGE-CS2025-008BetaActiveGasLGE-KULBNL

17 MW generation in Trimble, KY · In queue since December 2025 · Proposed COD October 2026

BA: PJMNERC: SERCRC: MISO

17 MW

Capacity

1

Components

Gas

11 months

In Queue

In Progress (unknown study)

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

10 months

Schedule

2 months past proposed COD

Study Phase

CS 2025

In Study38%
Queue EntryDec 18, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-10-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

LGE-KU-LGE-CS2025-008 is a proposed 17 MW natural gas generation project located in Trimble County, Kentucky, in the southeastern United States. No project name or developer is identified in the available queue data. The project is listed in the interconnection queue administered by LGE-KU, the transmission entity of Louisville Gas & Electric and Kentucky Utilities Energy. Its proposed point of interconnection is the Trimble County Switching Station at 345 kV, designated as Unit #8.

The project entered the queue on December 18, 2025, and holds an active status as part of the CS 2025 study phase. It has requested Network Resource Interconnection Service (NRIS). The interconnection agreement status is recorded as in progress, though the specific study underway is not identified. The proposed commercial operation date is October 1, 2026.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

KY

County

Trimble

Grid Region

Southeast

Market

—

Developer

—

Utility

Louisville Gas & Electric and Kentucky Utilities Energy

Entity

LGE-KU

Service Type

NRIS

Point of Interconnection

Trimble County Switching Station, 345 kV (Unit #8)

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
TVA
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project LGE-KU-LGE-CS2025-008
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.