LGE-KU-LGE-CS2025-004
200 MW hybrid in Lincoln, KY · In queue since December 2025 · Proposed COD December 2029
200 MW
Capacity
1
Components
Solar
11 months
In Queue
In Progress (unknown study)
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4 years
Study Phase
CS 2025
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-31
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Queue ID LGE-KU-LGE-CS2025-004 is a proposed hybrid solar and battery storage development project located in Lincoln County, Kentucky, in the southeastern United States. The project has a total capacity of 200 MW. Its listed components include a 200 MW solar facility, and the project is described as incorporating battery storage, though a separate capacity for the battery component is not specified. No developer has been publicly identified in the queue data. The project would interconnect at the West Garrard - Pineville 345 kV transmission line, within the service territory of Louisville Gas & Electric and Kentucky Utilities Energy (LG&E-KU).
The project entered the LG&E-KU interconnection queue on December 15, 2025, and is part of the Cluster Study 2025 (CS 2025) study phase. It has requested both Network Resource Interconnection Service (NRIS) and Energy Resource Interconnection Service (ERIS). The project's queue status is active, and its interconnection agreement status is listed as in progress, with the specific study stage unknown. The proposed commercial operation date is December 31, 2029.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
KY
County
Lincoln
Grid Region
Southeast
Market
—
Developer
—
Utility
Louisville Gas & Electric and Kentucky Utilities Energy
Entity
LGE-KU
Service Type
NRIS/ERIS
Point of Interconnection
West Garrard - Pineville 345 kV line
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- TVA
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Project LGE-KU-LGE-CS2025-004Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.