Project LADWP-Q86 — Project Summary

Queue ID
LADWP-Q86
Capacity
300 MW
Technology
Wind
Status
active
Location
Millard, UT
Region
West
Developer
Intermountain Power Agency
IA Status
In Progress (unknown study)

LADWP-Q86

LADWP-Q86BetaActiveWindLADWPLBNL

300 MW generation in Millard, UT · In queue since November 2021 · Proposed COD October 2025

BA: PACENERC: WECCRC: RCW

300 MW

Capacity

1

Components

Wind

5 years

In Queue

In Progress (unknown study)

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 11m

Schedule

14 months past proposed COD

In Study38%
Queue EntryNov 24, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-10-01

News-reported activity
as of 22 months ago

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestonepeak employment reachedUtility Dive · 2025-01-15
Expected COD2025Utility Dive · 2025-01-15

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 1, 2025
From queue filing
Developer in saved assessment
Intermountain Power Agency
From queue filing
Status at research time
Active
Active in the LADWP queue with the interconnection agreement still in progress. There is no project-specific evidence of wind construction or operation.
Financing
Not recorded
Research sources and reasoning (1 recorded sources)

low confidence at research time

  1. utilitydive.com/news/hydrogen-transforming-utah-coal-town-aces-delta-intermountain-power-project-ladwp/731685/

Commercial operation date: Only the LBNL filing gives a project-specific COD (2025-10-01). The Utility Dive article's 2025 expected COD appears to describe the Intermountain Power Project's gas/hydrogen plant, not this 300 MW wind queue entry, so I did not treat it as independent confirmation. No live search results were available.

Developer: LBNL lists Intermountain Power Agency and the news extraction names the same entity. However, the article covers the IPP gas/hydrogen repowering rather than this wind project, so I cannot confirm the match. There is no sign of a shell LLC or an ownership change.

Status: LBNL reports 'active' and is_operational is false. The news 'construction' phase refers to the Intermountain Power Project's gas/hydrogen units, so it does not support upgrading this wind queue entry to Construction.

Project lifecycle
as of 2025-01-15
PhaseConstructionUtility Dive · 2025-01-15
OperationalNoUtility Dive · 2025-01-15
TechnologygasUtility Dive · 2025-01-15
DeveloperIntermountain Power AgencyUtility Dive · 2025-01-15
PPA offtakerLos Angeles Department of Water and PowerUtility Dive · 2025-01-15

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

LADWP-Q86 is a proposed wind energy project with a total capacity of 300 MW. The project is located in Millard County, Utah, within the Western region, and is being developed by Intermountain Power Agency. It is interconnected to the Los Angeles Department of Water and Power (LADWP) grid at the IPP-Gonder 230kV Line.

The project entered the LADWP interconnection queue on November 24, 2021, with a proposed commercial operation date of October 1, 2025. Its interconnection agreement status is currently "In Progress (unknown study)". The project has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

UT

County

Millard

Grid Region

Mountain West

Market

—

Developer

Intermountain Power Agency

Utility

Los Angeles Department of Water and Power

Entity

LADWP

Service Type

—

Point of Interconnection

IPP-Gonder 230kV Line

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.