LADWP-Q83
220 MW storage in Millard, UT · In queue since September 2021 · Proposed COD October 2024
220 MW
Capacity
1
Components
Other Storage
5y 2m
In Queue
System Impact Study
IA Phase
COD target: 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 1m
Schedule
26 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-10-01
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
DOE provided $504.4M loan for Advanced Clean Energy Storage hydrogen facility at IPA Intermountain site
energy.govMemorandum of understanding signed for hydrogen storage project
utilitydive.comResearch sources and reasoning (4 recorded sources)
medium confidence at research time
- energy.gov/edf/advanced-clean-energy-storage
- deseret.com/utah/2025/04/25/delta-nuclear-ipa-energysolutions-utah/
- enr.com/articles/60610-coal-fired-power-plant-will-gain-new-life-with-green-hydrogen
- utilitydive.com/news/chevron-mitsubishi-hydrogen-storage-aces-delata-utah/693782/
Commercial operation date: LBNL queue snapshot shows proposed COD of 2024-10-01. No contradicting or confirming signals from news sources; the news-extracted facts focus on a different project (Advanced Clean Energy Storage hydrogen facility and Delta Nuclear Power Plant discussions) rather than this specific 220 MW battery project.
Developer: LBNL lists 'Intermountain Power Agency' as developer, and news-extracted facts confirm IPA as the company entity. The 'Advanced Clean Energy Storage' reference appears to be a related but separate hydrogen storage project at the same IPA site, not the battery project itself.
Status: LBNL shows 'active' status in System Impact Study phase. The proposed October 2024 COD has passed without evidence of operation, suggesting the project remains in development with delayed timeline.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
LADWP-Q83 is a proposed 220 MW battery storage project located in Millard County, Utah. The project, categorized as "Other Storage," is being developed by Intermountain Power Agency and is in the Los Angeles Department of Water and Power (LADWP) interconnection queue, with LADWP as the interconnecting entity. The queue entry date is September 28, 2021, and the proposed commercial operation date is October 1, 2024. The interconnection agreement status is listed as Operational.
The point of interconnection is the IPP 345kV Switchyard. The project has been the subject of recent news coverage, with nine articles categorized as industry news, development updates, and deal announcements.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
UT
County
Millard
Grid Region
Mountain West
Market
—
Developer
Intermountain Power Agency
Utility
Los Angeles Department of Water and Power
Entity
LADWP
Service Type
—
Point of Interconnection
IPP 345kV Switchyard
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- FOURCORNERS
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all 7 articlesNo Ask reports yet for this entity.
Ask about Project LADWP-Q83Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.