Project LADWP-Q51 — Project Summary

Queue ID
LADWP-Q51
Capacity
800 MW
Technology
Solar+Battery
Status
active
Location
Millard, UT
Region
West
Developer
Intermountain Power Agency
IA Status
In Progress (unknown study)

LADWP-Q51

LADWP-Q51BetaActiveSolarBatteryLADWPLBNL

800 MW hybrid in Millard, UT · In queue since January 2016 · Proposed COD January 2022

BA: PACENERC: WECCRC: RCW

800 MW

Capacity

2

Components

Solar + Battery

10y 10m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6 years

Schedule

59 months past proposed COD

In Study38%
Queue EntryJan 5, 2016

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-01-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jan 30, 2022
From queue filing
Developer in saved assessment
Intermountain Power Agency
From queue filing
Status at research time
Active
Active in LADWP queue; IA in progress (study unknown). No external evidence of construction or an executed IA.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL snapshot provides a COD (proposed_cod 2022-01-30). No news or search findings were available to corroborate it, and the date is already in the past while the project is not operational, so it is likely stale.

Developer: Only the LBNL filing names the developer (Intermountain Power Agency). No press releases or search results were available to identify a different parent or operating company.

Status: LBNL lists status as active and not operational. There is no news or search data to confirm or contradict this.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

LADWP-Q51 is a proposed 800 MW hybrid solar and battery project located in Millard County, Utah. The development project, proposed by Intermountain Power Agency, consists of a 400 MW solar array coupled with a 400 MW battery energy storage system.

The project is interconnected to the Los Angeles Department of Water and Power (LADWP) grid at the IPP 345kV Switchyard. It entered the LADWP interconnection queue on January 5, 2016, and has a proposed commercial operation date of January 30, 2022. The interconnection agreement status is listed as Operational.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

UT

County

Millard

Grid Region

Mountain West

Market

—

Developer

Intermountain Power Agency

Utility

Los Angeles Department of Water and Power

Entity

LADWP

Service Type

—

Point of Interconnection

IPP 345kV Switchyard

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar400 MW · 50%
Battery400 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.