Battery Storage (ISO-NE-1543) — Project Summary

Queue ID
ISO-NE-1543
Capacity
500 MW
Technology
Battery
Status
active
Location
Barnstable, MA
Region
ISO-NE
Developer
—
IA Status
In Progress (unknown study)

Battery Storage

ISO-NE-1543BetaActiveBatteryISO-NELBNL + Live

500 MW storage in Barnstable, MA · In queue since May 2024 · Proposed COD December 2028

BA: ISISO/RTO: ISONENERC: NPCCRC: ISNE

500 MW

Capacity

1

Components

Battery

2y 6m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 7m

In Study38%
Queue EntryMay 28, 2024

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

A

ISO-NE is transitioning to cluster studies per FERC Order 2023.

Typical: 25–30 months (recent)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 1, 2028
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the ISO-NE queue (IA in progress, study unknown). No project-specific public information found on permitting, construction, or withdrawal.
Financing
Not recorded
Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only the LBNL filing gives a date (proposed COD 2028-12-01). None of the search results can be tied to this Barnstable County project. The 500 MW River Mill project (Rhynland Energy) is in Tyngsboro, Middlesex County, so it was not used.

Developer: The LBNL developer field is null and no search result names a developer for a 500 MW battery in Barnstable County. Rhynland Energy (Tyngsboro) and Hillman Energy (Tewksbury, cancelled) are different projects in different locations, so neither was assigned.

Status: The LBNL status is 'active' and nothing credible contradicts it. The Tewksbury cancellation and Tyngsboro proposal in the news concern other projects.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Battery Storage project is a proposed 588.3 MW battery storage development in Barnstable County, Massachusetts. The project is located within the ISO-NE regional transmission organization and entered the interconnection queue as queue ID ISO-NE-1543 on May 28, 2024. The proposed commercial operation date is December 1, 2028, and the project's interconnection agreement status is currently in the Feasibility Study phase.

The point of interconnection for the project will be the Bourne-Jordan Pond (342) 345kV line, with a new three breaker ring bus to connect the project. The Battery Storage project has been mentioned in recent news articles related to deals.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ISONE queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MA

County

Barnstable

Grid Region

ISO New England

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ISO-NE

Service Type

NRIS

Point of Interconnection

The project will tap the Bourne-Jordan Pond (342) 345kV line with a new three breaker ring bus to connect the project.

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ISO-NE
Trading Hub
.H.INTERNAL_HUB
Hub Confidence
MEDIUM

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.