Battery Storage (ISO-NE-1518) — Project Summary

Queue ID
ISO-NE-1518
Capacity
136 MW
Technology
Battery
Status
active
Location
Berkshire, MA
Region
ISO-NE
Developer
—
IA Status
In Progress (unknown study)

Battery Storage

ISO-NE-1518BetaActiveBatteryISO-NELBNL + Live

136 MW storage in Berkshire, MA · In queue since April 2024 · Proposed COD August 2028

BA: ISISO/RTO: ISONENERC: NPCCRC: ISNE

136 MW

Capacity

1

Components

Battery

2y 7m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 4m

In Study38%
Queue EntryApr 9, 2024

Interconnection request submitted to ISO/RTO

TCS StudyCurrent

A

ISO-NE is transitioning to cluster studies per FERC Order 2023.

Typical: 25–30 months (recent)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-08-30

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.

Research COD
Aug 30, 2028
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — In interconnection study phase, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedApr 9, 2024Latest in this assessment

Project entered ISO-NE interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of August 2028. No independent news or research sources found to validate or contradict this date.

Developer: LBNL filing shows no developer entity. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating company.

Status: LBNL queue status shows active with IA in progress. No news coverage found to indicate construction activity, permitting milestones, or project advancement beyond interconnection studies.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The proposed Battery Storage project is a 139.5 MW battery storage facility located in Berkshire County, Massachusetts. The project is being developed within the ISO-NE region and interconnected to the Eversource Partridge 115kV Substation. It entered the ISO-NE interconnection queue as queue ID ISO-NE-1518 on April 9, 2024, with a proposed commercial operation date of August 30, 2028. The project's interconnection status is currently in the Feasibility Study phase.

The development project consists solely of battery storage, with a total capacity of 139.5 MW. The project is currently listed as active within the ISO-NE interconnection queue. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ISONE queue source as of: Oct 25, 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

MA

County

Berkshire

Grid Region

ISO New England

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ISO-NE

Service Type

NRIS

Point of Interconnection

Eversource, New Substation to be built at 42.488290, -73.219503

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ISO-NE
Trading Hub
.H.INTERNAL_HUB
Hub Confidence
HIGH
POI Substation
Substation 1

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.