Lite Brite Battery Storage (ISO-NE-1148) — Project Summary

Queue ID
ISO-NE-1148
Capacity
305.623993 MW
Technology
Battery
Status
active
Location
Suffolk, MA
Region
ISO-NE
Developer
—
IA Status
IA Executed

Lite Brite Battery Storage

ISO-NE-1148BetaActiveBatteryISO-NELBNL + Live

305.624 MW storage in Suffolk, MA · In queue since July 2021 · Proposed COD May 2028

BA: ISISO/RTO: ISONENERC: NPCCRC: ISNE

305.624 MW

Capacity

1

Components

Battery

5y 4m

In Queue

IA Executed

IA Phase

Signed Aug 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 1m

IA → COD

3y 9m

Total Duration

3y 1m

Construction75%
Queue EntryJul 13, 2021

Interconnection request submitted to ISO/RTO

TCS Study

ISO-NE is transitioning to cluster studies per FERC Order 2023.

Typical: 25–30 months (recent)

Interconnection AgreementAug 9, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

A

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2028-05-26

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 26, 2028
From queue filing
Developer in saved assessment
Flatiron Energy
Status at research time
Active
Active in the ISO-NE queue with an IA executed 2024-08-09. Flatiron reportedly paused its Boston indoor BESS, which is likely this project, so near-term construction is uncertain.
Financing
Not recorded
Research sources and reasoning (6 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/isone-1148
  2. irtt.iso-ne.com/reports/external
  3. cleanview.co/power-projects/planned/battery-storage-projects/massachusetts
  4. energy-storage.news/flatiron-energy-gets-iso-green-light-for-1-2gwh-indoor-bess-in-boston-massachusetts/
  5. energy-storage.news/flatiron-energy-proposes-672mwh-bess-at-former-massachusetts-fossil-plant-pauses-indoor-bess-project-in-boston/
  6. universalhub.com/2024/company-charges-forward-large-scale-power-storage

Commercial operation date: The ISO-NE queue report lists a 5/26/2028 proposed in-service date, and Cleanview's 'Expected Online: May 2028' appears to be copied from it. No independent developer or news source gives a newer COD. The Flatiron pause reported in Energy-Storage.News is a risk to this date.

Developer: The LBNL developer field is null. Cleanview's listing names Flatiron Energy next to Lite Brite, though the snippet layout is ambiguous. This fits the project's 300 MW size and the Electric Ave substation site, which match Flatiron's 1.2GWh indoor BESS in Brighton (Boston) and a Boulder, CO developer filing plans there. The attribution is inferred, not confirmed by a press release naming the queue ID.

Status: LBNL shows the project as active with an executed IA. Energy-Storage.News reports ISO-NE approval for Flatiron's Boston indoor BESS and later a pause of that project, but the link to queue ID 1148 is inferred. Active remains the queue-position status.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Lite Brite Battery Storage is a proposed 305.62 MW battery storage project located in Suffolk County, Massachusetts. The project, developed within the ISO-NE region, consists entirely of battery technology. It is listed in the ISO-NE interconnection queue as entry number 1148, with a queue entry date of July 13, 2021, and a proposed commercial operation date of May 26, 2028. The project's interconnection agreement (IA) has been executed. The point of interconnection (POI) is the Electric Avenue 115 kV substation (bus number 110926), Zone MA_NST.

The development has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ISONE queue source as of: Oct 25, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

MA

County

Suffolk

Grid Region

ISO New England

Market

ISO/RTO Member

Developer

—

Utility

—

Entity

ISO-NE

Service Type

NRIS

Point of Interconnection

Electric Avenue 115 kV substation (bus number 110926), Zone MA_NST

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
ISO-NE
Trading Hub
.H.INTERNAL_HUB
Hub Confidence
HIGH
Nearest Node (Estimated)
LD.ELECTRIC13.8
POI Substation
Electric Avenue Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.