Hecate Energy Eastern Ave Energy Center
250 MW storage in Suffolk, MA · In queue since April 2021 · Proposed COD November 2026
250 MW
Capacity
1
Components
Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Sep 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 5m
IA → COD
3y 2m
Total Duration
2y 5m
Schedule
0 months past proposed COD
Interconnection request submitted to ISO/RTO
ISO-NE is transitioning to cluster studies per FERC Order 2023.
Typical: 25–30 months (recent)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
A
Project under construction
Typical: 6–18 months
Proposed COD: 2026-11-09
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 25, 2026 queue source. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed with ISO-NE
lbnl_queue1.2 GWh CATL battery project progressing through Haverhill Conservation Committee permitting
pv-magazine-usa.comProposed commercial operation date per ISO-NE queue
lbnl_queueResearch sources and reasoning (2 recorded sources)
medium confidence at research time
- pv-magazine-usa.com/2024/10/03/1-2-gwh-catl-battery-progresses-through-permitting-in-massachusetts/
- universalhub.com/2024/company-charges-forward-large-scale-power-storage
Commercial operation date: LBNL queue shows proposed COD of 2026-11-09. No contradicting dates found in news sources; construction start reported Sept 2024 makes late 2026 COD plausible.
Developer: News extraction confirms 'Hecate Energy' as applicant, matching the project name. LBNL developer field is null but project name includes 'Hecate Energy', consistent with news sources.
Status: LBNL shows IA executed 2023-09-05. News confirms construction start action in Sept 2024 and active permitting Oct 2024, indicating project advancing post-IA.
About
Generated Apr 10, 2026 · Predates Oct 25, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Hecate Energy Eastern Ave Energy Center is a proposed 250 MW battery storage project located in Suffolk County, Massachusetts. The project consists of a single 250 MW battery component.
The project is listed in the ISO-NE interconnection queue as queue ID 1115, with an entry date of April 8, 2021, and a proposed commercial operation date of November 9, 2026. Its interconnection agreement has been executed. The point of interconnection is the Sta 488 Chelsea 115 kV substation. The project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ISONE queue source as of: Oct 25, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
MA
County
Suffolk
Grid Region
ISO New England
Market
ISO/RTO Member
Developer
—
Utility
—
Entity
ISO-NE
Service Type
NRIS
Point of Interconnection
Sta 488 Chelsea 115 kV substation
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ISO-NE
- Trading Hub
- .H.INTERNAL_HUB
- Hub Confidence
- MEDIUM
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesHecate Grid Gwent Storage 1
Data-driven briefing on Hecate Energy — fleet, generation, financial, and news signals.
Hecate Energy Ramsey Storage
Data-driven briefing on Hecate Energy — fleet, generation, financial, and news signals.
Massachusetts growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Hecate Grid East Valley Storage
Data-driven briefing on Hecate Energy — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.