Project IP-785 — Project Summary

Queue ID
IP-785
Capacity
199 MW
Technology
Solar+Battery
Status
active
Location
Juab, UT
Region
West
Developer
—
IA Status
Facility Study

IP-785

IP-785BetaActiveSolarBatteryIPLBNL

199 MW hybrid in Juab, UT · In queue since April 2025 · Proposed COD September 2027

BA: PACENERC: WECCRC: RCW

199 MW

Capacity

1

Components

Solar

1y 7m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 5m

Study Phase

Cluster 1

Facilities Study50%
Queue EntryApr 14, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-01

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

IP-785 is a proposed solar and battery storage hybrid development project in Juab County, Utah, in the western United States. The project has a total capacity of 199 megawatts (MW). Its listed components include 199 MW of solar generation, and it also incorporates a battery storage element, though the data does not specify a separate capacity for the battery. No developer has been publicly identified for the project.

The project is in the interconnection queue administered by Idaho Power Company, which it entered on April 14, 2025. It proposes to interconnect at the 345 kV Mona Substation and has requested Network Resource Interconnection Service (NRIS). As of the latest available data, the project's queue status is active. It is being evaluated as part of Cluster 1 and is in the Facility Study phase of the interconnection process. The proposed commercial operation date is September 1, 2027.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

UT

County

Juab

Grid Region

Mountain West

Market

—

Developer

—

Utility

Idaho Power Company

Entity

IP

Service Type

NRIS

Point of Interconnection

345kV Mona Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
FOURCORNERS
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Project IP-785
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.