Flint River 2 780 MW Unit (GTC-GI-210) — Project Summary

Queue ID
GTC-GI-210
Capacity
780 MW
Technology
Gas
Status
active
Location
Mitchell, GA
Region
Southeast
Developer
—
IA Status
In Progress (unknown study)

Flint River 2 780 MW Unit

GTC-GI-210BetaActiveGasGTCLBNL

780 MW generation in Mitchell, GA · In queue since March 2025 · Proposed COD June 2029

BA: SOCONERC: SERCRC: SOCO

780 MW

Capacity

1

Components

Gas

1y 8m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 3m

In Study38%
Queue EntryMar 29, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-06-01

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2029
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the GTC queue (GI-210), with the IA in progress and no study identified. No public evidence of permitting, construction or financing.
Financing
Not recorded
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/georgia-transmission-gi-210
  2. interxdata.com/projects/flint-river-2-780-mw-unit-gtc-oasis-gi-210/
  3. interxdata.com/utilities/georgia-transmission-2f255d/

Commercial operation date: Only the LBNL queue record (proposed COD 2029-06-01) and aggregator sites that mirror it are available. The interconnection.fyi page repeats June 1, 2029 and shows no independent developer or news signal.

Developer: The LBNL developer field is null. No search result names a developer or operating company. The queue is Georgia Transmission's (GTC), but the requesting entity is not identified.

Status: LBNL and aggregator pages (interxdata, interconnection.fyi) agree the queue status is active. The queue date is March 2025, so the request is recent. A queue position is a study application, not a build forecast.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Flint River 2 780 MW Unit is a proposed natural gas-fired generation project located in Mitchell County, Georgia, in the southeastern United States. The development project has a total planned capacity of 780 megawatts (MW), consisting entirely of a single gas-fired component. The project would interconnect to the transmission system at the Raccoon Creek Substation, within the service territory of Georgia Transmission.

The project is listed in the Georgia Transmission Corporation (GTC) interconnection queue under queue ID GTC-GI-210. It entered the queue on March 29, 2025, and remains in active status. Its interconnection agreement status is recorded as in progress, though the specific study phase has not been identified. The project's proposed commercial operation date is June 1, 2029.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Mitchell

Grid Region

Southeast

Market

—

Developer

—

Utility

Georgia Transmission

Entity

GTC

Service Type

—

Point of Interconnection

Raccoon Creek Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.