SR Norwood II (GTC-GI-206) — Project Summary

Queue ID
GTC-GI-206
Capacity
143 MW
Technology
Solar
Status
active
Location
Warren, GA
Region
Southeast
Developer
—
IA Status
System Impact Study

SR Norwood II

GTC-GI-206BetaActiveSolarGTCLBNL

143 MW generation in Warren, GA · In queue since December 2024 · Proposed COD December 2028

BA: SOCONERC: SERCRC: SOCO

143 MW

Capacity

1

Components

Solar

1y 11m

In Queue

System Impact Study

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Impact Study25%
Queue EntryDec 19, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — System Impact Study phase, queue entry December 2024
Financing
Not recorded

Milestones in this assessment

IA executedDec 19, 2024Latest in this assessment

Project entered GTC interconnection queue, System Impact Study phase

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2028-12-31. No independent news or press releases found to validate or contradict this date.

Developer: LBNL filing shows no developer entity. No press releases, corporate announcements, or news coverage found identifying the project sponsor or operating company.

Status: LBNL status shows active queue position with System Impact Study in progress. No news of withdrawal, suspension, or advancement to later stages.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The SR Norwood II project is a proposed 143 MW solar generation project located in Warren County, Georgia. The project is being developed within the Georgia Transmission (GTC) service area. It is listed in the GTC interconnection queue as project GTC-GI-206, with an entry date of December 19, 2024. The proposed commercial operation date is December 31, 2029.

The interconnection agreement for the SR Norwood II project is currently listed as "In Progress (unknown study)". The point of interconnection is the Sinquefield Road 115 kV Substation. The project has appeared in recent news.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Warren

Grid Region

Southeast

Market

—

Developer

—

Utility

Georgia Transmission

Entity

GTC

Service Type

—

Point of Interconnection

Sinquefield Road 115 kV Substation

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.