Washington County Solar (GTC-GI-197) — Project Summary

Queue ID
GTC-GI-197
Capacity
203 MW
Technology
Solar+Battery
Status
active
Location
Washington, GA
Region
Southeast
Developer
—
IA Status
System Impact Study

Washington County Solar

GTC-GI-197BetaActiveSolarBatteryGTCLBNL

203 MW hybrid in Washington, GA · In queue since October 2024 · Proposed COD April 2027

BA: SOCONERC: SERCRC: SOCO

203 MW

Capacity

1

Components

Solar

2y 1m

In Queue

System Impact Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 6m

Impact Study25%
Queue EntryOct 1, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-04-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 1, 2027
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — System Impact Study phase in Georgia Transmission Corporation queue, no public construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedOct 2024Latest in this assessment

Entered GTC queue for System Impact Study

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of April 2027. No independent news or press releases found to validate or contradict this date.

Developer: LBNL filing shows no developer entity. Live search returned no results identifying the project sponsor or operating company.

Status: LBNL status shows Active with System Impact Study in progress. No news coverage found to indicate construction start, financing, or status changes.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Washington County Solar is a proposed 200 MW hybrid solar and battery energy storage project located in Washington County, Georgia. The project, developed by an unknown entity, consists of 200 MW of solar generation. It is interconnected to the Georgia Transmission Corporation (GTC) via the Tiger Creek 230kV Substation.

The project is listed in the GTC interconnection queue as entry GTC-GI-197, with a queue entry date of October 1, 2024. Its proposed commercial operation date is April 1, 2047, and its interconnection status is currently in the System Impact Study phase. The Washington County Solar project has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Washington

Grid Region

Southeast

Market

—

Developer

—

Utility

Georgia Transmission

Entity

GTC

Service Type

—

Point of Interconnection

Tiger Creek 230 kV Substation

Data Source

LBNL

DeveloperArevon EnergyPV Tech · 2025-09-05
TransactionTax equityPV Tech · 2025-09-05
Deal value$250.0MPV Tech · 2025-09-05
LenderWells FargoPV Tech · 2025-09-05
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.