Altamaha Green Energy (GTC-GI-195) — Project Summary

Queue ID
GTC-GI-195
Capacity
70 MW
Technology
Other
Status
active
Location
Wayne, GA
Region
Southeast
Developer
IA Status
Facility Study

Altamaha Green Energy

GTC-GI-195BetaActiveOtherGTCLBNL

70 MW generation in Wayne, GA · In queue since August 2024 · Proposed COD March 2028

BA: SOCONERC: SERCRC: SOCO

70 MW

Capacity

1

Components

Other

1y 11m

In Queue

Facility Study

IA Phase

COD target: 2028

Interconnection

Total Duration

3y 7m

Facilities Study50%
Queue EntryAug 20, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-03-01

About

Altamaha Green Energy is a proposed 70 MW generation project located in Wayne County, Georgia. The project, categorized as "Other" technology, is being developed within the Georgia Transmission (GTC) service area. It entered the GTC interconnection queue (GTC-GI-195) on August 20, 2024, with a proposed commercial operation date of March 1, 2028. The project's interconnection status is currently in the System Impact Study phase.

The proposed project consists of 70 MW of "Other" generation technology. Altamaha Green Energy has been the subject of recent news coverage, with nine articles categorized as deals, industry, regulatory, and development.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Wayne

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

Jessup – Ludowici Primary 115 kV TL

Data Source

LBNL

DeveloperAltamaha Green EnergyBusiness Wire · 2024-09-23
TransactionPPABusiness Wire · 2024-09-23
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles
InfraSure platform