Talbot U7
250 MW generation in Talbot, GA · In queue since August 2024 · Proposed COD March 2029
250 MW
Capacity
1
Components
Gas
2y 3m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-03-31
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Queue entry filed with GTC, Facility Study phase initiated
macon.comResearch sources and reasoning (2 recorded sources)
medium confidence at research time
- macon.com/news/environment/article311538064.html
- powermag.com/georgia-power-to-keep-coal-gas-power-plants-running-longer-as-demand-climbs-2/
Commercial operation date: LBNL queue shows 2029-03-31 target. News extraction indicates 2029-2031 range from Macon Telegraph, suggesting potential 1-2 year variance but general alignment with LBNL filing date.
Developer: News extraction identifies Georgia Power as developer with 0.8 confidence from Macon Telegraph. LBNL filing shows null developer, likely because Georgia Power filed under its own name rather than a project LLC.
Status: LBNL shows active status in Facility Study phase. No contradictory signals from news sources indicating withdrawal or suspension.
About
Generated Apr 10, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Talbot U7 project is a proposed 250 MW gas-fired generation project located in Talbot County, Georgia. The project, sponsored by GTC, entered the Georgia Transmission (GTC) interconnection queue as queue ID GTC-GI-194 on August 5, 2024, with a proposed commercial operation date of March 31, 2029. Its interconnection agreement status is listed as "In Progress (unknown study)".
The point of interconnection is planned for the Talbot County 1 or 2 substation. The Talbot U7 project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- LBNL queue source as of: Dec 31, 2025.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
GA
County
Talbot
Grid Region
Southeast
Market
—
Developer
—
Utility
Georgia Transmission
Entity
GTC
Service Type
—
Point of Interconnection
Talbot County 1 or 2 substation (TBD)
Data Source
LBNL
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- SOUTHEAST
- Trading Hub
- Southern Company
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-09
View all articlesGeorgia Power at Wadley GA
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Georgia Power at Swainsboro
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Georgia Power at Jakin GA PV
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.