Live Oak Solar (GTC-GI-175) — Project Summary

Queue ID
GTC-GI-175
Capacity
200 MW
Technology
Solar+Battery
Status
active
Location
Laurens, GA
Region
Southeast
Developer
—
IA Status
Facility Study

Live Oak Solar

GTC-GI-175BetaActiveSolarBatteryGTCLBNL

200 MW hybrid in Laurens, GA · In queue since May 2023 · Proposed COD October 2026

BA: SOCONERC: SERCRC: SOCO

200 MW

Capacity

1

Components

Solar

3y 6m

In Queue

Facility Study

IA Phase

COD target: 2026

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 5m

Schedule

2 months past proposed COD

Facilities Study50%
Queue EntryMay 20, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-10-05

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Oct 5, 2026
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — Facility Study phase in GTC queue, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedMay 20, 2023Latest in this assessment

Entered GTC interconnection queue as GTC-GI-175

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of October 2026. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL filing shows no developer entity. Live search returned no results identifying the project sponsor, operating company, or filing LLC.

Status: LBNL status is 'active' with Facility Study underway. No news coverage found to indicate progression beyond interconnection studies or any withdrawal/suspension.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Live Oak Solar project is a proposed 200 MW hybrid solar and battery energy storage project located in Laurens County, Georgia. The project consists of 200 MW of solar generation. It is listed in the Georgia Transmission Corporation (GTC) interconnection queue as project GTC-GI-175.

The project entered the GTC queue on May 20, 2023, and has a proposed commercial operation date of October 5, 2026. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the 230 kV Bus at North Dublin 230 kV SS.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Laurens

Grid Region

Southeast

Market

—

Developer

—

Utility

Georgia Transmission

Entity

GTC

Service Type

—

Point of Interconnection

230 kV Bus at North Dublin 230 kV SS

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.