RV Solar (GTC-GI-136) — Project Summary

Queue ID
GTC-GI-136
Capacity
100 MW
Technology
Solar
Status
active
Location
Tattnall, GA
Region
Southeast
Developer
—
IA Status
Facility Study

RV Solar

GTC-GI-136BetaActiveSolarGTCLBNL

100 MW generation in Tattnall, GA · In queue since February 2020 · Proposed COD November 2022

BA: SOCONERC: SERCRC: SOCO

100 MW

Capacity

1

Components

Solar

6y 9m

In Queue

Facility Study

IA Phase

COD target: 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 9m

Schedule

48 months past proposed COD

Facilities Study50%
Queue EntryFeb 23, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-11-30

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
2022
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active — marked operational in LBNL data as of queue snapshot, suggesting project achieved commercial operation
Financing
Not recorded

Milestones in this assessment

COD targetNov 30, 2022Latest in this assessment

LBNL proposed commercial operation date

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: LBNL proposed COD of 2022-11-30 is the only available date signal. Project is marked operational in LBNL data, suggesting it may have achieved COD around the proposed timeframe, though no independent confirmation exists.

Developer: No developer information provided in LBNL filing and no news or search results identified the project sponsor or operating company.

Status: LBNL status shows 'active' with is_operational flag set to true, indicating the project has reached commercial operation, though no external confirmation available.

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The RV Solar project is a proposed 100 MW solar generation project located in Tattnall County, Georgia. The project is in the Georgia Transmission (GTC) interconnection queue, identified as GTC-GI-136, with a queue entry date of February 23, 2020. The proposed commercial operation date is November 30, 2022. Its interconnection status is currently in the Facility Study phase.

The RV Solar project has been mentioned in recent news coverage related to the energy industry.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

GA

County

Tattnall

Grid Region

Southeast

Market

—

Developer

—

Utility

Georgia Transmission

Entity

GTC

Service Type

—

Point of Interconnection

Claxton-Ludowici Primary 115 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.