SR Metter (GTC-GI-128) — Project Summary

Queue ID
GTC-GI-128
Capacity
80 MW
Technology
Solar
Status
active
Location
Candler, GA
Region
Southeast
Developer
—
IA Status
Construction

SR Metter

GTC-GI-128BetaActiveSolarGTCLBNL

80 MW generation in Candler, GA · In queue since October 2019 · Proposed COD November 2025

BA: SOCONERC: SERCRC: SOCO

80 MW

Capacity

1

Components

Solar

7y 1m

In Queue

Construction

IA Phase

COD target: 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 1m

Schedule

12 months past proposed COD

In Study38%
Queue EntryOct 10, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-11-30

Project lifecycle
as of 2022-12-15
OperationalNoData Center Dynamics · 2022-12-15
TechnologySolarData Center Dynamics · 2022-12-15
DeveloperSilicon RanchData Center Dynamics · 2022-12-15
PPA offtakerMetaData Center Dynamics · 2022-12-15

About

Saved background

Generated Apr 10, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The SR Metter project is a proposed 80 MW solar generation project located in Candler County, Georgia. The project is being developed within the Georgia Transmission (GTC) interconnection queue as project GTC-GI-128. The queue entry date is October 10, 2019, with a proposed commercial operation date of November 30, 2025. The project's interconnection agreement status is currently listed as "Construction".

The proposed project is linked to the existing SR Metter operating plant (EIA plant ID 68250). Recent news coverage indicates the project has been featured in at least six news articles related to grid infrastructure.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk through commissioning — schedule slippage, construction cost overrun, and COD probability vs the stated window. The diligence view that determines whether the project comes online when promised. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD within window)
Cost overrun probability
Schedule slippage vs plan
Project Details

State

GA

County

Candler

Grid Region

Southeast

Market

—

Developer

—

Utility

Georgia Transmission

Entity

GTC

Service Type

—

Point of Interconnection

Statesboro - Vidalia 230 kV TL

Data Source

LBNL

DeveloperSilicon RanchData Center Dynamics · 2022-12-15
TransactionPPAData Center Dynamics · 2022-12-15
OfftakerMetaData Center Dynamics · 2022-12-15
PPA structurePhysicalData Center Dynamics · 2022-12-15
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with curtailment risk decomposed by congestion zone and ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Curtailment risk by node
Weather + policy scenarios
Financial Forecast

Forward revenue, first-year DSCR, and construction cost overrun exposure — what determines whether the deal clears its covenants once online. Projected across price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

First-year DSCR
Cost overrun probability
Price + demand scenarios
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.