All Star Solar (GTC-GI-124) — Project Summary

Queue ID
GTC-GI-124
Capacity
95 MW
Technology
Solar
Status
active
Location
Appling, GA
Region
Southeast
Developer
IA Status
Facility Study

All Star Solar

GTC-GI-124BetaActiveSolarGTCLBNL

95 MW generation in Appling, GA · In queue since October 2019 · Proposed COD December 2023

BA: SOCONERC: SERCRC: SOCO

95 MW

Capacity

1

Components

Solar

6y 9m

In Queue

Facility Study

IA Phase

COD target: 2023

Interconnection

Total Duration

4y 2m

Schedule

31 months past proposed COD

Facilities Study50%
Queue EntryOct 4, 2019

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2023-12-31

About

All Star Solar is a proposed 95 MW solar generation project located in Appling County, Georgia. The project is being developed within the Georgia Transmission (GTC) service area and is interconnected to the Pine Grove 115 kV Substation. It entered the GTC interconnection queue (GTC-GI-124) on October 4, 2019, and has a proposed commercial operation date of December 31, 2023. The project's interconnection status is currently in the Facility Study phase.

The All Star Solar project has been the subject of recent news coverage, with five articles published across regulatory, grid, and industry categories.

Generated from interconnection queue and public data sources

Development Risk

Realization history for this asset — final cost vs plan, COD slip vs original date, and construction duration vs cohort. Retrospective context for the operating risk view above. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

Final cost vs plan
COD vs original date
Construction duration vs cohort
Project Details

State

GA

County

Appling

Grid Region

Southeast

Market

Developer

Utility

Georgia Transmission

Entity

GTC

Service Type

Point of Interconnection

Pine Grove 115 kV Substation

Data Source

LBNL

Risk Analytics

Composite operating risk view for this asset — climate hazards across its remaining operating life, observed generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — 10-year P50 trajectory accounting for degradation, observed curtailment, and market conditions, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
Degradation-adjusted CF
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR bands, and refinancing risk for this asset — 10-year cashflow projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year cashflow horizon
P10 / P50 / P90 DSCR bands
Price + demand + policy scenarios
Market Context
Approximate
ISO / RTO
SOUTHEAST
Trading Hub
Southern Company
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about All Star Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.