Blue Energy Center - Phase 3 – Steam Stage 2 (ERCOT-33INR0007) — Project Summary

Queue ID
ERCOT-33INR0007
Capacity
1320 MW
Technology
Nuclear
Status
active
Location
Victoria, TX
Region
ERCOT
Developer
Sister 1, LLC
IA Status
—

Blue Energy Center - Phase 3 – Steam Stage 2

ERCOT-33INR0007BetaActiveNuclearSteam TurbineERCOTLive · ERCOT

1,320 MW hybrid in Victoria, TX · In queue since September 2026 · Proposed COD June 2033

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,320 MW

Capacity

0

Components

1 month

In Queue

—

IA Status

COD target: 2033

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 9m

Pre-Study0%
Queue EntrySep 10, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2033-06-15

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-10-25
Expected COD
2033-06-15
From queue filing
Developer
—
From queue filing
Status
Active
Active in ERCOT queue — new Sep 2026 entry, no IA, feasibility/interconnection studies started (SS and FIS started); early-stage with no construction.
Financing
Unannounced
About

Blue Energy Center - Phase 3 – Steam Stage 2 is a proposed nuclear power development project in Victoria County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Sister 1, LLC, the project has a total proposed capacity of 1,320 MW. It is classified as a hybrid project, with technology components listed as nuclear and steam turbine. Individual capacities for each component are not specified in the available data.

The project is listed in the ERCOT interconnection queue under queue ID ERCOT-33INR0007 and holds an active status. Its queue entry date is September 10, 2026, and its proposed commercial operation date is June 15, 2033. The project's proposed point of interconnection is a tap on the 345 kV line between the DULCE7A (bus 80286) and STATIC7A (bus 8676) substations. Information on the status of an interconnection agreement is not available in the provided data.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Victoria

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sister 1, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345kV 80286 DULCE7A - 8676 STATIC7A

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.