Bullock Gas (ERCOT-33INR0005) — Project Summary

Queue ID
ERCOT-33INR0005
Capacity
1400 MW
Technology
Gas
Status
active
Location
Hill, TX
Region
ERCOT
Developer
Bullock Data Center, LLC
IA Status
—

Bullock Gas

ERCOT-33INR0005BetaActiveGasCombined-CycleERCOTLive · ERCOT

1,400 MW generation in Hill, TX · In queue since June 2026 · Proposed COD July 2032

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,400 MW

Capacity

0

Components

4 months

In Queue

—

IA Status

COD target: 2032

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

6y 1m

Pre-Study0%
Queue EntryJun 12, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2032-07-01

Cross-source intelligence
Beta
Low confidence·2 sources·as of 2026-10-25
Expected COD
2032-07-01
From queue filing
Developer
Bullock Data Center, LLC
From queue filing
Status
Active
Active in the ERCOT queue (33INR0005), 1400 MW gas project in Hill County, TX. The name suggests it may serve a data center load. No public construction, permitting, or IA milestones were found.
Financing
Unannounced
About

Bullock Gas (ERCOT queue ID 33INR0005) is a proposed natural gas-fired, combined-cycle generation project located in Hill County, Texas. Developed by Bullock Data Center, LLC, the project has a total proposed capacity of 1,400 MW. It would interconnect to the grid at the Bullock 345 kV Station (Bus# 68096), within the Electric Reliability Council of Texas (ERCOT) region.

The project entered the ERCOT interconnection queue on June 12, 2026, and its status is listed as active. Its proposed commercial operation date is July 1, 2032. The provided data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hill

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Bullock Data Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

BULLOCK 345 KV STATION (Bus# 68096)

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Bullock Gas
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.