H&C WILBARGER POWER II
1,025.55 MW generation in Wilbarger, TX · In queue since August 2026 · Proposed COD February 2032
1,025.55 MW
Capacity
0
Components
2 months
In Queue
—
IA Status
COD target: 2032
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 6m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2032-02-27
H&C Wilbarger Power II is a proposed natural gas combined-cycle generation project located in Wilbarger County, Texas. The development project has a total planned capacity of 1,025.55 MW and is being developed by H&C Wilbarger Power I. The project would connect to the grid via a tap on the 345 kV transmission line between the Riley (6101 RILEY7A) and Edith Clarke (60505 EDITHCLA7B) substations, which serves as its designated point of interconnection.
The project is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-32INR0008, where it holds an active status. It entered the queue on August 11, 2026, and has a proposed commercial operation date of February 27, 2032. The provided data does not specify the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Wilbarger
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
H&C WILBARGER POWER I
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 6101 RILEY7A - 60505 EDITHCLA7B
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about H&C WILBARGER POWER IIForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.