Capshaw Solar (ERCOT-30INR0158) — Project Summary

Queue ID
ERCOT-30INR0158
Capacity
450 MW
Technology
Solar
Status
active
Location
Reeves, TX
Region
ERCOT
Developer
NextEra Energy Resources Interconnection Holding, LLC
IA Status
—

Capshaw Solar

ERCOT-30INR0158BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

450 MW generation in Reeves, TX · In queue since August 2026 · Proposed COD July 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

450 MW

Capacity

0

Components

2 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 11m

Pre-Study0%
Queue EntryAug 25, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-07-01

Cross-source intelligence
Beta
Low confidence·5 sources·as of 2026-10-25
Expected COD
2030-07-01
From queue filing
Developer
NextEra Energy Resources
Filed as NextEra Energy Resources Interconnection Holding, LLC
Status
Active
Active in the ERCOT queue with no interconnection agreement (IA) executed. A Reeves County lease filing cites a 1,600-acre Capshaw Solar Farm site, but no construction, permitting or offtake announcements were found.
Financing
Unannounced
About

Capshaw Solar is a proposed 450 MW photovoltaic solar generation project in Reeves County, Texas. The development project is sponsored by NextEra Energy Resources Interconnection Holding, LLC, and is located within the Electric Reliability Council of Texas (ERCOT) region. It is designed as a standalone solar facility. The project data does not identify a battery storage or other hybrid component.

The project is listed in the ERCOT interconnection queue under queue ID ERCOT-30INR0158 and holds an active status. It entered the queue on August 25, 2026, and has a proposed commercial operation date of July 1, 2030. The proposed point of interconnection taps the 345 kV transmission line between the Drylake_5 (#18723) and TNFaulkner3 (#38125) buses. The available data does not specify the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextEra Energy Resources Interconnection Holding, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

POIB: Tapping Drylake_5 (#18723) – TNFaulkner3 (#38125) 345 kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Capshaw Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.