Blue Sage Wind (ERCOT-30INR0135) — Project Summary

Queue ID
ERCOT-30INR0135
Capacity
394.54 MW
Technology
Wind
Status
active
Location
Andrews, TX
Region
ERCOT
Developer
CPV Blue Sage Wind, LLC
IA Status
—

Blue Sage Wind

ERCOT-30INR0135BetaActiveWindWind TurbineERCOTLive · ERCOT

394.54 MW generation in Andrews, TX · In queue since July 2026 · Proposed COD April 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

394.54 MW

Capacity

0

Components

3 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryJul 22, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-04-23

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-10-25
Expected COD
2030-04-23
From queue filing
Developer
Competitive Power Ventures (CPV)
Filed as CPV Blue Sage Wind, LLC
Status
Active
Active in the ERCOT queue, in study (POI: Doghouse 345kV substation), with no interconnection agreement executed. No construction or financing announcements found.
Financing
Unannounced
About

Blue Sage Wind is a proposed wind generation project located in Andrews County, Texas. Developed by CPV Blue Sage Wind, LLC, the project has a planned total capacity of 394.54 MW and would use wind turbine technology. The proposed project is designed to connect to the grid at Bus #11270, Doghouse_5, located at The Doghouse 345 kV Substation.

The project is listed in the Electric Reliability Council of Texas (ERCOT) interconnection queue under queue ID ERCOT-30INR0135 and currently holds an active status. It entered the queue on July 22, 2026, and has a proposed commercial operation date of April 23, 2030. The available data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Andrews

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

CPV Blue Sage Wind, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

BUS #11270 - DOGHOUSE_5 - THE DOGHOUSE 345kV SUBSTATION

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Blue Sage Wind
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.