Wallflower Solar (ERCOT-30INR0092) — Project Summary

Queue ID
ERCOT-30INR0092
Capacity
201.15 MW
Technology
Solar
Status
active
Location
Zapata, TX
Region
ERCOT
Developer
Wallflower Solar, LLC
IA Status
—

Wallflower Solar

ERCOT-30INR0092BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

201.15 MW generation in Zapata, TX · In queue since March 2026 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.15 MW

Capacity

0

Components

8 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 9m

Pre-Study0%
Queue EntryMar 10, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-30

Queue history
30INR0092 · 7 monthly ERCOT reports, Mar 2026 – Sep 2026

Projected COD moved

0 times

Dec 2029 → Dec 2029

Net change

0 months

first report to latest

Capacity

201 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 10, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 30, 2029
From queue filing
Developer in saved assessment
Wallflower Solar, LLC
From queue filing
Status at research time
Active
Active — early-stage queue position, no public construction or financing announcements
Financing
Not recorded

Milestones in this assessment

IA executedMar 10, 2026Latest in this assessment

Entered ERCOT interconnection queue

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of 2029-12-30. No independent news or press releases found to validate or contradict this date.

Developer: Only LBNL filing entity 'Wallflower Solar, LLC' is available. No news coverage found to identify a parent operating company or confirm if this is a project-specific LLC.

Status: LBNL status shows 'active' with queue date of March 2026. No news coverage or milestones found to indicate progression beyond initial interconnection request.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Wallflower Solar is a proposed photovoltaic solar generation project in Zapata County, Texas, with a total planned capacity of 201.15 MW. The project is being developed by Wallflower Solar, LLC and is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-30INR0092. The development project's proposed point of interconnection is a tap on the 345 kV transmission line between the Cenizo substation (#80225) and the Del Sol substation (#80307).

The project entered the ERCOT interconnection queue on March 10, 2026, and its status is listed as active. Its proposed commercial operation date is December 30, 2029. The available data does not indicate the status of an interconnection agreement for the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Zapata

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Wallflower Solar, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap the 345 kV Cenizo (#80225) - Del Sol (#80307) line.

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.