BM Great Rock Energy Center
1,981.2 MW generation in Leon, TX · In queue since March 2026 · Proposed COD May 2029
1,981.2 MW
Capacity
0
Components
8 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 2m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-05-15
Projected COD moved
0 times
May 2029 → May 2029
Net change
0 months
first report to latest
Capacity
991 → 1981 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-30inr0091
- ercotqueue.com/project/30INR0091
- crglc.org/projects/
- cleanview.co/power-projects/planned/natural-gas-power-plants/texas/30INR0091/bm-great-rock-energy-center
- interconnection.fyi/projects/market/ERCOT
Commercial operation date: Only LBNL/ERCOT queue data gives a COD of 2029-05-15. Cleanview and interconnection.fyi repeat the same date (May 2029) and appear to derive it from the queue filing, so they are not independent confirmation. No developer press release or news article gives a financing-backed target.
Developer: All sources, including ercotqueue.com and the crglc.org project page, name Black Mountain Energy Storage II as the filer. No parent or operating company is identified in the results, so the name could be a shell entity but this can't be confirmed.
Status: LBNL and ercotqueue.com/interconnection.fyi list the project as active with no IA. interxdata's 'operational' label conflicts with this and is inconsistent with a 2029 proposed COD and a March 2026 queue date, so I discounted it.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
BM Great Rock Energy Center is a proposed natural gas combined-cycle generation project in Leon County, Texas, with a total planned capacity of 1,981.2 MW. The project is being developed by Black Mountain Energy Storage II and is located within the Electric Reliability Council of Texas (ERCOT) region. It is planned to connect to the grid through a tap on two 345 kV transmission circuits. The first is the Gibbons Creek (GIBN_CREK_5) to Limestone POI (LIMEST_POI_5) Circuit 18. The second is the Yellow Wolf to Limestone POI Circuit 50.
The project entered the ERCOT interconnection queue on March 3, 2026, under queue ID ERCOT-30INR0091, and its status is listed as active. Its proposed commercial operation date is May 15, 2029. The available data does not indicate the status of an interconnection agreement for the project.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Leon
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Black Mountain Energy Storage II
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap <345kV> <967> <GIBN_CREK_5> - <46020> <LIMEST_POI_5> Ckt<18> and <345kV> <79007> < YELLOW WOLF> - <46020> <LIMEST_POI_5> Ckt<50>
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
Great Falls (VT)
Data-driven briefing on BM Great Rock Energy Center — fleet, generation, financial, and news signals.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.