BM Great Rock Energy Center (ERCOT-30INR0091) — Project Summary

Queue ID
ERCOT-30INR0091
Capacity
1981.2 MW
Technology
Gas
Status
active
Location
Leon, TX
Region
ERCOT
Developer
Black Mountain Energy Storage II
IA Status
—

BM Great Rock Energy Center

ERCOT-30INR0091BetaActiveGasCombined-CycleERCOTLive · ERCOT

1,981.2 MW generation in Leon, TX · In queue since March 2026 · Proposed COD May 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,981.2 MW

Capacity

0

Components

8 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 2m

Pre-Study0%
Queue EntryMar 3, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-05-15

Queue history
30INR0091 · 8 monthly ERCOT reports, Feb 2026 – Sep 2026

Projected COD moved

0 times

May 2029 → May 2029

Net change

0 months

first report to latest

Capacity

991 → 1981 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 3, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
May 15, 2029
From queue filing
Developer in saved assessment
Black Mountain Energy Storage II
From queue filing
Status at research time
Active
Active in ERCOT queue, filed March 2026, no interconnection agreement (No IA); ercotqueue.com gives a 1% build-chance. A sibling request, BM Great Rock Energy Center II (29INR0366), is withdrawn.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-30inr0091
  2. ercotqueue.com/project/30INR0091
  3. crglc.org/projects/
  4. cleanview.co/power-projects/planned/natural-gas-power-plants/texas/30INR0091/bm-great-rock-energy-center
  5. interconnection.fyi/projects/market/ERCOT

Commercial operation date: Only LBNL/ERCOT queue data gives a COD of 2029-05-15. Cleanview and interconnection.fyi repeat the same date (May 2029) and appear to derive it from the queue filing, so they are not independent confirmation. No developer press release or news article gives a financing-backed target.

Developer: All sources, including ercotqueue.com and the crglc.org project page, name Black Mountain Energy Storage II as the filer. No parent or operating company is identified in the results, so the name could be a shell entity but this can't be confirmed.

Status: LBNL and ercotqueue.com/interconnection.fyi list the project as active with no IA. interxdata's 'operational' label conflicts with this and is inconsistent with a 2029 proposed COD and a March 2026 queue date, so I discounted it.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

BM Great Rock Energy Center is a proposed natural gas combined-cycle generation project in Leon County, Texas, with a total planned capacity of 1,981.2 MW. The project is being developed by Black Mountain Energy Storage II and is located within the Electric Reliability Council of Texas (ERCOT) region. It is planned to connect to the grid through a tap on two 345 kV transmission circuits. The first is the Gibbons Creek (GIBN_CREK_5) to Limestone POI (LIMEST_POI_5) Circuit 18. The second is the Yellow Wolf to Limestone POI Circuit 50.

The project entered the ERCOT interconnection queue on March 3, 2026, under queue ID ERCOT-30INR0091, and its status is listed as active. Its proposed commercial operation date is May 15, 2029. The available data does not indicate the status of an interconnection agreement for the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Leon

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Black Mountain Energy Storage II

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap <345kV> <967> <GIBN_CREK_5> - <46020> <LIMEST_POI_5> Ckt<18> and <345kV> <79007> < YELLOW WOLF> - <46020> <LIMEST_POI_5> Ckt<50>

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.