Gravitas I Wind
636.54 MW generation in Pecos, TX · In queue since March 2026 · Proposed COD June 2030
636.54 MW
Capacity
0
Components
8 months
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-30
Projected COD moved
0 times
Jun 2030 → Jun 2030
Net change
0 months
first report to latest
Capacity
637 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (7 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-30inr0085
- ercotqueue.com/project/30INR0085
- app.nrgmap.com/queues/ercot-30inr0085
- savrn.com/data-center-permits-tracker/texas
- quicksandcheck.com/texas/pecos-county/
- gridglasses.com/queue/ERCOT-30INR0085
- interxdata.com/projects/gravitas-i-wind-ercot-gis-report-30inr0085/
Commercial operation date: Only the ERCOT queue filing date exists. interconnection.fyi, Quicksand Check and Cleanview all repeat the same June 2030 proposed completion date, and none is an independent developer or press signal. The queue entry was filed in March 2026, so the date is unlikely to be stale.
Developer: Every source names S&S Renewables, LLC, and the aggregators all draw on the ERCOT filing. GridGlasses hints at a parent behind the LLC, but the snippet doesn't name one. The sister projects (Gravitas I Solar, Gravitas I Natural Gas, Ross Solar, Permian I Wind) are filed under the same entity.
Status: ERCOT-derived trackers (NRG Map, as of Sept 2026; ercotqueue.com; Savrn) agree the project is active with no IA. The interXdata 'operational' label conflicts with all of them and looks like a normalization artifact, so I disregarded it.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Gravitas I Wind is a proposed wind generation project located in Pecos County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by S&S Renewables, LLC, the development project has a total planned capacity of 636.54 megawatts (MW) and would use wind turbine technology to generate electricity. The project is designed to connect to the grid at a tap on the 345 kV Solstice (60404) to Bakersfield (76002) double-circuit transmission line.
The project is listed in the ERCOT interconnection queue under queue ID ERCOT-30INR0085 and holds an active status. It entered the queue on March 24, 2026, and has a proposed commercial operation date of June 30, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
S&S Renewables, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.