Gravitas I Natural Gas
1,247.04 MW generation in Pecos, TX · In queue since March 2026 · Proposed COD June 2030
1,247.04 MW
Capacity
0
Components
8 months
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-30
Projected COD moved
0 times
Jun 2030 → Jun 2030
Net change
0 months
first report to latest
Capacity
1247 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-30inr0084
- ercotqueue.com/project/30INR0084
- cleanview.co/power-projects/planned/natural-gas-power-plants/texas/30INR0084/gravitas-i-natural-gas
Commercial operation date: Only the LBNL/ERCOT filing gives a COD (proposed 2030-06-30). Aggregator pages (interconnection.fyi, cleanview.co) repeat the same date and are not independent post-filing developer signals. No press releases or news cover the project.
Developer: Only the LBNL filing entity is named; interconnection.fyi and ercotqueue.com repeat it. No parent or operating company was identified in any source.
Status: LBNL and queue trackers (interconnection.fyi, ercotqueue.com) show the project as active with no IA. No news indicates withdrawal or construction.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Gravitas I Natural Gas is a proposed natural gas-fired generation project in Pecos County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by S&S Renewables, LLC, the project would have a total capacity of 1,247.04 megawatts (MW) and would use internal combustion technology. It would connect to the grid at a tap on the 345 kV Solstice (60404) – Bakersfield (76002) double-circuit transmission line.
The project is listed in the ERCOT interconnection queue under queue ID ERCOT-30INR0084 and entered the queue on March 24, 2026. Its status is active, and it has a proposed commercial operation date of June 30, 2030. The available data do not indicate the status of an interconnection agreement.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Pecos
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
S&S Renewables, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV Solstice (60404) - Bakersfield (76002) Double circuit line
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_WEST
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
SCHNEIDER GAS RICE PHASE 2 Natural Gas queue pipeline — 1 projects by technology and status
Data-driven briefing on Gravitas I Natural Gas — fleet, generation, financial, and news signals.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.