Springfield Solar (ERCOT-30INR0058) — Project Summary

Queue ID
ERCOT-30INR0058
Capacity
400 MW
Technology
Solar
Status
active
Location
Pecos, TX
Region
ERCOT
Developer
BOULEVARD ASSOCIATES, LLC
IA Status
Facility Study

Springfield Solar

ERCOT-30INR0058BetaActiveSolarERCOTLBNL + Live

400 MW generation in Pecos, TX · In queue since September 2025 · Proposed COD August 2028

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

400 MW

Capacity

1

Components

Solar

1y 2m

In Queue

Facility Study

IA Phase

Signed Dec 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3 months

IA → COD

2y 8m

Total Duration

3 months

Construction50%
Queue EntrySep 9, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection AgreementDec 24, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

SS Completed, FIS Started, IA

Project under construction

Typical: 12–24 months

Commercial Operation

Proposed COD: 2028-08-30

Queue history
30INR0058 · 13 monthly ERCOT reports, Sep 2025 – Sep 2026

Projected COD moved

2 times

Jul 2030 → Aug 2028

Net change

-23 months

first report to latest

Capacity

400 MW

unchanged in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedSep 9, 2025
Interconnection agreement signedDec 24, 2025

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Aug 30, 2028
From queue filing
Developer in saved assessment
Boulevard Associates, LLC
From queue filing
Status at research time
Active
Active in ERCOT queue at Facility Study stage (facility study date 2025-12-24); no public construction or offtake news found.
Financing
Not recorded
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/texas/30INR0058/springfield-solar
  2. interconnection.fyi/project/ercot-30inr0058

Commercial operation date: Only the LBNL filing gives a specific date (2028-08-30). Cleanview says 'Expected online 2028', but that is a tracker listing likely derived from the same ERCOT queue data, not an independent developer or press signal.

Developer: The news-extracted developer 'Alliant Energy' comes from a 2022 Milwaukee Journal Sentinel article on a Wisconsin solar financing. It has no link to a 400 MW project in Pecos County, TX, so I treated it as a mismatch and discarded it. No source identifies a parent behind Boulevard Associates, LLC.

Status: LBNL lists the project as active, and interconnection.fyi independently shows it as currently active in the ERCOT queue. Nothing indicates withdrawal or construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Springfield Solar is a proposed 400 MW solar generation project located in Pecos County, Texas. Developed by BOULEVARD ASSOCIATES, LLC, the project consists of photovoltaic solar technology and is interconnected within the ERCOT region. It is listed in the ERCOT interconnection queue as entry ERCOT-30INR0058, with a queue entry date of September 9, 2025, and a proposed commercial operation date of August 30, 2028. The project's Interconnection Agreement (IA) date is December 24, 2025.

The Point of Interconnection (POI) is the Tap Leon Creek (#38355) to Woodhouse Station (#38308) 138kV line. The Springfield Solar project has been mentioned in recent news coverage, with 11 articles categorized as industry, grid, and regulatory.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Pecos

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BOULEVARD ASSOCIATES, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap Leon Creek (#38355) to Woodhouse Station (#38308) 138kV line

Data Source

LBNL + Live

DeveloperAlliant EnergyMilwaukee Journal Sentinel · 2022-10-28
TransactionTax equityMilwaukee Journal Sentinel · 2022-10-28
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (1)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.