Hecate Energy Jamaica Wind (ERCOT-30INR0003) — Project Summary

Queue ID
ERCOT-30INR0003
Capacity
1029.39 MW
Technology
Wind
Status
active
Location
Galveston, TX
Region
ERCOT
Developer
Hecate Energy LLC
IA Status
Facility Study

Hecate Energy Jamaica Wind

ERCOT-30INR0003BetaActiveWindERCOTLBNL + Live

1,029.39 MW generation in Galveston, TX · In queue since June 2023 · Proposed COD June 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,029.39 MW

Capacity

1

Components

Wind

3y 5m

In Queue

Facility Study

IA Phase

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

7 years

Facilities Study50%
Queue EntryJun 28, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Started, No IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-01

Queue history
30INR0003 · 18 monthly ERCOT reports, Apr 2025 – Sep 2026

Projected COD moved

0 times

Jun 2030 → Jun 2030

Net change

0 months

first report to latest

Capacity

1029 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedJun 28, 2023

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 1, 2030
From queue filing
Developer in saved assessment
Hecate Energy
From queue filing
Status at research time
Active
Active in the ERCOT queue. Interconnection screening study is complete and the facility study has started. No IA is signed (NRG Map, ERCOT data as of 2026-09-01).
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. app.nrgmap.com/queues/ercot-30inr0003
  2. interconnection.fyi/project/ercot-30inr0003
  3. ercotqueue.com/project/30INR0003
  4. ercotqueue.com/developer/hecate-energy-llc

Commercial operation date: Only queue-derived data exists. The LBNL proposed COD of 2030-06-01 is repeated by interconnection.fyi and NRG Map, but both mirror the ERCOT filing. No developer press release or news gives an independent target.

Developer: Every source, including Cleanview's Hecate Energy pipeline page and ercotqueue.com, lists Hecate Energy LLC as the developer. This is the operating company itself rather than a shell LLC, and no project-specific press release adds anything further. The Hecate SPAC article is general corporate news and does not mention this project.

Status: LBNL lists the project as active, and NRG Map's ERCOT data as of 1 September 2026 confirms it, showing SS completed, FIS started and no IA. No news points to withdrawal or construction.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Hecate Energy Jamaica Wind is a proposed wind generation project located in Galveston County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Hecate Energy LLC, the development project has a planned total capacity of 1,029.39 MW, consisting entirely of wind generation. The project is designed to interconnect to the grid at the P. H. Robinson 345 kV point of interconnection (identified as 42000 P. H. Robinson 345kV).

The project is listed in the ERCOT interconnection queue under queue ID ERCOT-30INR0003, with a queue entry date of June 28, 2023. Its status in the queue is active, and it is currently in the Facility Study phase of the interconnection process. The proposed commercial operation date for the project is June 1, 2030.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Galveston

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Hecate Energy LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

42000 P. H. Robinson 345kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_HOUSTON
Hub Confidence
MEDIUM
Nearest Node (Estimated)
BAC_RN_ALL
POI Substation
P. H. Robinson Switching Station

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.