Aurelius 3 Natural Gas (ERCOT-29INR0361) — Project Summary

Queue ID
ERCOT-29INR0361
Capacity
1275 MW
Technology
Gas
Status
active
Location
Deaf Smith, TX
Region
ERCOT
Developer
IP Roman III Gas, LLC
IA Status
—

Aurelius 3 Natural Gas

ERCOT-29INR0361BetaActiveGasInternal CombustionERCOTLive · ERCOT

1,275 MW generation in Deaf Smith, TX · In queue since June 2026 · Proposed COD June 2030

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,275 MW

Capacity

0

Components

4 months

In Queue

—

IA Status

COD target: 2030

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4 years

Pre-Study0%
Queue EntryJun 29, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-06-30

Cross-source intelligence
Beta
Low confidence·4 sources·as of 2026-10-25
Expected COD
2030-06-30
From queue filing
Developer
IP Roman III Gas, LLC
From queue filing
Status
Active
Active in the ERCOT queue with no Interconnection Agreement (ercotqueue.com: 'Currently No IA; build-chance 21%'). Proposed POI is the Deaf Smith 345 kV station. No public sign of construction or permitting.
Financing
Unannounced
About

Aurelius 3 Natural Gas is a proposed natural gas-fired generation project located in Deaf Smith County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by IP Roman III Gas, LLC, the project has a total proposed capacity of 1,275 MW and is planned to use internal combustion technology. It is registered in the ERCOT interconnection queue under the identifier ERCOT-29INR0361.

The project entered the ERCOT queue on June 29, 2026, and currently holds an active status. Its proposed point of interconnection is the Deaf Smith station 345 kV substation (bus 23908). The developer has targeted a commercial operation date of June 30, 2030. The available data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Deaf Smith

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

IP Roman III Gas, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

23908 Deaf Smith station 345 kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Deaf Smith #6 Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Aurelius 3 Natural Gas
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.