Trumpet Solar (ERCOT-29INR0360) — Project Summary

Queue ID
ERCOT-29INR0360
Capacity
533 MW
Technology
Solar
Status
active
Location
Reeves, TX
Region
ERCOT
Developer
NextEra Energy Resources Interconnection Holdings LLC
IA Status
—

Trumpet Solar

ERCOT-29INR0360BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

533 MW generation in Reeves, TX · In queue since June 2026 · Proposed COD July 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

533 MW

Capacity

0

Components

4 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 1m

Pre-Study0%
Queue EntryJun 17, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-07-01

Cross-source intelligence
Beta
Low confidence·5 sources·as of 2026-10-25
Expected COD
2029-07-01
From queue filing
Developer
NextEra Energy Resources
Filed as NextEra Energy Resources Interconnection Holdings LLC
Status
Active
Active in ERCOT queue — no IA; SS and FIS started (study phase); county posted a Trumpet Solar public notice 2026-07-10; no construction reported
Financing
Unannounced
About

Trumpet Solar is a proposed 533 MW photovoltaic solar generation project located in Reeves County, Texas. The development project is being pursued by NextEra Energy Resources Interconnection Holdings LLC and is planned to interconnect within the Electric Reliability Council of Texas (ERCOT) grid. The project's proposed point of interconnection is a tap on the 345 kV transmission line between the Drylake_5 (bus 18723) and TNFaulkner3 (bus 38125) substations.

The project is listed in the ERCOT interconnection queue under queue ID 29INR0360, with a queue entry date of June 17, 2026. Its status in the queue is active, and it has a proposed commercial operation date of July 1, 2029. The available data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NextEra Energy Resources Interconnection Holdings LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 345kV 18723 Drylake_5 – 38125 TNFaulkner3

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.