Wolf Bone North Energy Center (ERCOT-29INR0354) — Project Summary

Queue ID
ERCOT-29INR0354
Capacity
1174.4 MW
Technology
Gas
Status
active
Location
Reeves, TX
Region
ERCOT
Developer
NRG Wolf Bone Energy Center LLC
IA Status
—

Wolf Bone North Energy Center

ERCOT-29INR0354BetaActiveGasCombined-CycleERCOTLive · ERCOT

1,174.4 MW generation in Reeves, TX · In queue since September 2026 · Proposed COD February 2031

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,174.4 MW

Capacity

0

Components

1 month

In Queue

—

IA Status

COD target: 2031

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 5m

Pre-Study0%
Queue EntrySep 4, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2031-02-28

Cross-source intelligence
Beta
Medium confidence·4 sources·as of 2026-10-25
Expected COD
2031-02-28
From queue filing
Developer
NRG Energy
Filed as NRG Wolf Bone Energy Center LLC
Status
Active
Active in the ERCOT queue and pre-construction. The TCEQ air permit (181059 / PSDTX1676 / GHGPSDTX257) was applied for in Aug 2025 and was at draft technical review. No IA is executed. It replaces the earlier 29INR0162 entry, which is listed as withdrawn.
Financing
Unannounced
About

The Wolf Bone North Energy Center is a proposed natural gas-fired generation project in Reeves County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by NRG Wolf Bone Energy Center LLC, the project is planned as a combined-cycle gas facility with a total capacity of 1,174.4 MW. It is listed in the ERCOT interconnection queue under the identifier ERCOT-29INR0354.

The project entered the ERCOT queue on September 4, 2026, and holds an active status. Its proposed commercial operation date is February 28, 2031. The point of interconnection is the TNMP Cowpen 345 kV Substation (POIB 38044). A 4-mile transmission line is planned to connect the point of interconnection at the customer substation to the point of interconnection bus in the Cowpen substation. The available data does not indicate the status of an interconnection agreement.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NRG Wolf Bone Energy Center LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

TNMP Cowpen 345kV Substation POIB 38044 (4 mile transmission line will connect POI at customer substation to POIB in the Cowpen substation)

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
POI Substation
Substation 41

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Wolf Bone North Energy Center
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.