White Star Energy Storage (ERCOT-29INR0332) — Project Summary

Queue ID
ERCOT-29INR0332
Capacity
201.2 MW
Technology
Battery
Status
active
Location
Karnes, TX
Region
ERCOT
Developer
White Star Energy Storage, LLC
IA Status
—

White Star Energy Storage

ERCOT-29INR0332BetaActiveOtherBattery Energy StorageERCOTLive · ERCOT

201.2 MW hybrid in Karnes, TX · In queue since May 2026 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

201.2 MW

Capacity

0

Components

5 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 7m

Pre-Study0%
Queue EntryMay 13, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-31

About

White Star Energy Storage is a proposed battery energy storage development project located in Karnes County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by White Star Energy Storage, LLC and has a total proposed capacity of 201.2 MW. Although battery storage is its primary technology, the project is classified as a hybrid, with its components listed as battery energy storage and an unspecified "other" technology. The available data does not break out the individual capacities of these components.

The project is listed in the ERCOT interconnection queue under queue ID ERCOT-29INR0332, with a queue entry date of May 13, 2026, and its status is active. It proposes to interconnect at the Milton Substation (78583 L_MILTON8_1Y). The proposed commercial operation date is December 31, 2029. The available data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Karnes

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

White Star Energy Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Milton Substation 78583 L_MILTON8_1Y

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_SOUTH
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MILTON_RN
POI Substation
Milton Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about White Star Energy Storage
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.