Moon Chapel Solar
402.01 MW generation in Tom Green, TX · In queue since April 2026 · Proposed COD December 2029
402.01 MW
Capacity
0
Components
6 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-31
Moon Chapel Solar is a proposed photovoltaic solar development project located in Tom Green County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The project is being developed by Orsted Onshore Development North America, LLC, and has a total proposed capacity of 402.01 megawatts (MW). It is classified as a generation project and would rely solely on photovoltaic solar technology, with no storage or other hybrid components listed in its interconnection request.
The project is listed in the ERCOT interconnection queue under the identifier ERCOT-29INR0328. It entered the queue on April 22, 2026, and its status is active. The proposed point of interconnection is a tap on the 345 kV circuit between the Divide (76090) and Twin Buttes (76009) substations, designated Circuit 1. The developer has proposed a commercial operation date of December 31, 2029. The available data does not indicate the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Tom Green
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Orsted Onshore Development North America, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 76090 Divide – 76009 Twin Buttes Ckt 1
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- CALLAHA_WND1
- POI Substation
- Callahan Divide Wind Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Moon Chapel SolarForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.