Montgomery Ranch 2 Wind
301.5 MW generation in Foard, TX · In queue since May 2026 · Proposed COD June 2030
301.5 MW
Capacity
0
Components
5 months
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-02
Montgomery Ranch 2 Wind (queue ID ERCOT-29INR0326) is a proposed wind generation development project in Foard County, Texas. The project is being developed by RWE Clean Energy Development, LLC and has a total planned capacity of 301.5 MW. It would generate electricity using wind turbines and is planned to interconnect at the Penumbra 345-kV point of interconnection (bus 60059).
The project is in the interconnection queue administered by the Electric Reliability Council of Texas (ERCOT), where it entered on May 11, 2026. Its queue status is listed as active. The proposed commercial operation date is June 2, 2030. The available data does not indicate the status of an interconnection agreement.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Foard
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
RWE Clean Energy Development, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
60059 Penumbra 345-kV
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Montgomery Ranch 2 WindForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.