Sweetwater 4 Repower (ERCOT-29INR0325) — Project Summary

Queue ID
ERCOT-29INR0325
Capacity
421.2 MW
Technology
Wind
Status
active
Location
Nolan, TX
Region
ERCOT
Developer
Sweetwater Wind 4 LLC
IA Status
—

Sweetwater 4 Repower

ERCOT-29INR0325BetaActiveWindWind TurbineERCOTLive · ERCOT

421.2 MW generation in Nolan, TX · In queue since April 2026 · Proposed COD February 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

421.2 MW

Capacity

0

Components

7 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

2y 10m

Pre-Study0%
Queue EntryApr 22, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-02-01

Queue history
29INR0325 · 6 monthly ERCOT reports, Apr 2026 – Sep 2026

Projected COD moved

0 times

Feb 2029 → Feb 2029

Net change

0 months

first report to latest

Capacity

421 MW

unchanged in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedApr 22, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 1, 2029
From queue filing
Developer in saved assessment
Leeward Renewable Energy (LRE)
Filed as Sweetwater Wind 4 LLC
Status at research time
Active
Active in the ERCOT queue with no interconnection agreement. ercotqueue.com shows 'No IA' and a 13% build-chance estimate. No construction or permitting news was found.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/project/ercot-29inr0325
  2. cleanview.co/power-projects/planned/wind-farms/texas/29INR0325/sweetwater-4-repower
  3. lreus.com/projects/sweetwater-wind-4/
  4. ercotqueue.com/project/29INR0325

Commercial operation date: The only COD signal is the queue's proposed completion date of February 1, 2029, which interconnection.fyi repeats and Cleanview summarizes as "Expected online 2029". Both are queue-derived aggregators, not developer or news sources, so there is no independent post-LBNL date. The queue entry is also very recent (2026-04-22), so it is unlikely to be stale.

Developer: LRE's site lists the existing Sweetwater Wind 4 project (Nolan County, 2007 COD) as one it majority-owns and operates, and its name and location match the LBNL filing entity. No source explicitly ties LRE to the repower filing, so the parent link is inferred from the matching project name and county. The existing project's other owner, Duke Energy Renewables, held 47% per LRE's page.

Status: LBNL and multiple trackers (interconnection.fyi, ercotqueue.com) show the repower as active with no IA. The interxdata 'operational' label most likely reflects the existing 2007 Sweetwater 4 plant, not this repower request, so I disregarded it.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sweetwater 4 Repower is a proposed wind generation project located in Nolan County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Developed by Sweetwater Wind 4 LLC, the development project has a total proposed capacity of 421.2 megawatts (MW) and would use wind turbine technology. As its name indicates, the project is planned as a repowering effort.

The project is listed in the ERCOT interconnection queue under the identifier ERCOT-29INR0325 and holds an active status. It entered the queue on April 22, 2026, and has a proposed commercial operation date of February 1, 2029. The project's proposed point of interconnection is identified as bus 71050 (L_BITTCR5_1Y) at the 345 kV transmission level. The available data does not indicate the status of an interconnection agreement for the project.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Nolan

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Sweetwater Wind 4 LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

<71050> <L_BITTCR5_1Y> <345kV>

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.