Richardson McClung Ranch BESS
205.49 MW hybrid in Eastland, TX · In queue since January 2026 · Proposed COD November 2029
205.49 MW
Capacity
0
Components
9 months
In Queue
—
IA Status
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
3y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-11-30
The Richardson McClung Ranch BESS is a proposed battery energy storage development project in Eastland County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. Rising Star Energy Center, LLC is developing the project, which has a total capacity of 205.49 megawatts (MW). It is classified as a hybrid project, with technology components listed as battery energy storage and an additional component categorized as "Other." The project would connect to the grid at the Rising Star 138 kV point of interconnection (bus 33285).
The project is listed in the ERCOT interconnection queue under queue ID ERCOT-29INR0275 and has an active status. It entered the queue on January 26, 2026, and its proposed commercial operation date is November 30, 2029. The available data does not specify the status of an interconnection agreement for the project.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Eastland
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Rising Star Energy Center, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
33285 Rising Star 138 kV
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- MEDIUM
- POI Substation
- Rising Star Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about Richardson McClung Ranch BESSForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.