Queue ID
ERCOT-29INR0274
Capacity
251.95 MW
Technology
Solar
Status
active
Location
Eastland, TX
Region
ERCOT
Developer
Rising Star Energy Center, LLC
IA Status
—

Richardson McClung Ranch Solar

ERCOT-29INR0274BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

251.95 MW generation in Eastland, TX · In queue since January 2026 · Proposed COD November 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

251.95 MW

Capacity

0

Components

9 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

4 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 10m

Pre-Study0%
Queue EntryJan 28, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-11-30

About

Richardson McClung Ranch Solar is a proposed photovoltaic solar generation project located in Eastland County, Texas, within the Electric Reliability Council of Texas (ERCOT) region. The development project is being advanced by Rising Star Energy Center, LLC and has a planned total capacity of 251.95 MW. The project is designed to connect to the grid at the Rising Star 138 kV point of interconnection (bus 33285).

The project is listed in the ERCOT interconnection queue under the identifier ERCOT-29INR0274 and currently holds an active status. It entered the queue on January 28, 2026, and its proposed commercial operation date is November 30, 2029. The provided data does not indicate the status of an interconnection agreement for the project.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Eastland

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Rising Star Energy Center, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

33285 Rising Star 138 kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
MEDIUM
POI Substation
Rising Star Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Richardson McClung Ranch Solar
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.