Sugarberry Solar SLF (ERCOT-29INR0251) — Project Summary

Queue ID
ERCOT-29INR0251
Capacity
125 MW
Technology
Solar
Status
active
Location
Kinney, TX
Region
ERCOT
Developer
EG Sugarberry LLC
IA Status
—

Sugarberry Solar SLF

ERCOT-29INR0251BetaActiveSolarPhotovoltaic SolarERCOTLive · ERCOT

125 MW generation in Kinney, TX · In queue since February 2026 · Proposed COD December 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

125 MW

Capacity

0

Components

9 months

In Queue

—

IA Status

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

3y 10m

Pre-Study0%
Queue EntryFeb 13, 2026

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-18

Queue history
29INR0251 · 8 monthly ERCOT reports, Feb 2026 – Sep 2026

Projected COD moved

0 times

Dec 2029 → Dec 2029

Net change

0 months

first report to latest

Capacity

127 → 125 MW

changed in the reports

Latest stage

Screening started

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedFeb 13, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Dec 18, 2029
From queue filing
Developer in saved assessment
EG Sugarberry LLC
From queue filing
Status at research time
Active
Active — queue position secured as of February 2025, no public announcements on construction timeline or financing
Financing
Not recorded

Milestones in this assessment

IA executedFeb 13, 2026Latest in this assessment

ERCOT interconnection queue entry dated February 2026

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of December 2029. No independent news or press releases found to validate or contradict this target date.

Developer: Only LBNL filing entity 'EG Sugarberry LLC' is available. No press releases or corporate announcements found to identify a parent operating company. The 'EG' prefix suggests this may be a project LLC, but no parent entity could be confirmed.

Status: LBNL status shows 'active' with recent queue date (Feb 2025). No news coverage found to indicate construction activity, permitting progress, or project withdrawal.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Sugarberry Solar is a proposed 127.3 MW solar generation project located in Kinney County, Texas. The project, developed by EG Sugarberry LLC, is listed in the ERCOT interconnection queue as entry ERCOT-29INR0251, with a queue entry date of February 13, 2026. The proposed commercial operation date is December 18, 2029.

The project utilizes photovoltaic solar technology. It is currently listed as active in the interconnection queue. The point of interconnection is the 78255 Pinto Creek 138 kV location.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Kinney

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

EG Sugarberry LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

78255 Pinto Creek 138 kV

Data Source

Live · ERCOT

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
MEDIUM
Nearest Node (Estimated)
ZIER_SLR_ALL
POI Substation
Pinto Creek Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.