Blue Energy Center - Phase 1b – Steam
330 MW generation in Victoria, TX · In queue since January 2026 · Proposed COD October 2031
330 MW
Capacity
0
Components
10 months
In Queue
—
IA Status
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
5y 9m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-10-17
Projected COD moved
1 time
Mar 2029 → Oct 2031
Net change
+31 months
first report to latest
Capacity
1200 → 330 MW
changed in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
medium confidence at research time
- blueenergytexas.com/
- blueenergy.co/news/blue-energy-submits-construction-permit-application-to-nuclear-regulatory-commission
- bizjournals.com/washington/news/2026/06/29/blue-energy-texas-power-plant.html
- cleanview.co/power-projects/planned/natural-gas-power-plants/texas/29INR0248/blue-energy-center---phase-1b--steam
- app.nrgmap.com/queues/ercot-29inr0248
Commercial operation date: Only the LBNL/ERCOT date (2031-10-17) exists for this steam phase, and Cleanview just repeats it. Blue Energy's site says 'First gas power expected in 2030' for the gas turbines and nuclear 'estimated to begin 2032', with FID in 2027. None of that gives a dated COD for the Phase 1b steam block, so it doesn't override LBNL.
Developer: The queue entry is the Blue Energy Center (Port of Victoria) Phase 1b project in Victoria County, TX, which Blue Energy is developing as a gas-to-nuclear plant. No source explicitly ties Brother 1, LLC to Blue Energy; I inferred it as the project shell from the project name and location. The news-extracted facts (CPS Energy / JK Spruce 1 coal retirement) concern a different project and were discarded.
Status: LBNL and ERCOT queue aggregators show the request as active. Blue Energy's Sept 2026 announcement confirms the project is still being developed, with no cancellation or withdrawal signal.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Cerulean Unit 1 project is a proposed 1200 MW natural gas combined-cycle generation project located in Victoria County, Texas. The developer is Brother 1, LLC. It is currently active in the ERCOT interconnection queue as entry ERCOT-29INR0248, with a queue entry date of January 26, 2026, and a proposed commercial operation date of March 30, 2029. The point of interconnection is at Tap <345kV> <#5915> <South Texas Project SO_TEX__345A > - <#80286> <DULCE7A>.
The Cerulean Unit 1 project has been the subject of recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Victoria
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Brother 1, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV 80286 DULCE7A - 8676 STATIC7A
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_SOUTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesTOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.