Roan Solar Phase 1 (ERCOT-29INR0185) — Project Summary

Queue ID
ERCOT-29INR0185
Capacity
205.9 MW
Technology
Solar
Status
active
Location
Sterling, TX
Region
ERCOT
Developer
Roan Solar, LLC
IA Status
Facility Study

Roan Solar Phase 1

ERCOT-29INR0185BetaActiveSolarERCOTLBNL + Live

205.9 MW generation in Sterling, TX · In queue since October 2025 · Proposed COD April 2029

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

205.9 MW

Capacity

1

Components

Solar

9 months

In Queue

Facility Study

IA Phase

COD target: 2029

Interconnection

Total Duration

3y 6m

Facilities Study50%
Queue EntryOct 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-04-30

Cross-source intelligence
Beta
Low confidence·0 sources·as of 2026-06-01
Expected COD
2029-04-30
From queue filing
Developer
Roan Solar, LLC
From queue filing
Status
Active
Active — Facility Study stage, queue date October 2025 indicates very early-stage project with no public development announcements yet
Financing
Unannounced
Key milestones
IA executedOct 2025Most recent

Entered ERCOT interconnection queue, Facility Study stage

About

Roan Solar Phase 1 is a proposed solar generation project located in Sterling County, Texas, with a total capacity of 205.9 MW. The project, developed by Roan Solar, LLC, is interconnected within the ERCOT region and entered the ERCOT interconnection queue as entry 29INR0185 on October 21, 2025. The proposed commercial operation date is April 30, 2029.

The point of interconnection (POI) is the Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV line. The project's interconnection status is currently listed as active. The technology used is photovoltaic solar.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Sterling

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

Roan Solar, LLC

Utility

Entity

ERCOT

Service Type

Point of Interconnection

Divide (#76090) to Sand Bluff Wind Farm (#59902) 345 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about Roan Solar Phase 1
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.