Sweetheart BESS
310.16 MW generation in Young, TX · In queue since August 2025 · Proposed COD December 2029
310.16 MW
Capacity
1
Components
Battery
1y 3m
In Queue
Facility Study
IA Phase
COD target: 2029
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 4m
Interconnection request submitted to ISO/RTO
SS Completed, FIS Started, No IA
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-01
Projected COD moved
1 time
Feb 2029 → Dec 2029
Net change
+10 months
first report to latest
Capacity
310 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/ercot-29inr0172
- ercotqueue.com/project/29INR0172
- ercotqueue.com/developer/sweetheart-energy-llc
- cleanview.co/power-projects/planned/battery-storage-projects/texas/29INR0172/sweetheart-bess
Commercial operation date: Only queue-derived data exists. LBNL lists 2029-12-01, and the interconnection.fyi mirror and Cleanview ("Expected online 2029") repeat it. No independent developer or press-release target was found.
Developer: Only the LBNL filing entity appears, and ercotqueue.com lists the same name (2 active projects). No parent or operating company was identified in any source.
Status: LBNL shows active, and the tracker sites match. The queue date is recent (2025-08), the IA is not executed, and no public development progress was found.
About
Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
Sweetheart BESS is a proposed 310.16 MW hybrid battery energy storage project located in Young County, Texas. Developed by Sweetheart Energy, LLC, the project is in the ERCOT interconnection queue as entry ERCOT-29INR0172, with a queue entry date of August 26, 2025. The proposed commercial operation date is February 14, 2029.
The project is listed as a hybrid project including battery energy storage. The point of interconnection is Tap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH. The project is currently listed as active in the interconnection queue.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Young
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
Sweetheart Energy, LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap 345kV #1430 GRAHAM SES - # 17002 GARVEY ROAD SWITCH
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Sweetheart Solar queue pipeline — 1 projects by technology and status
Data-driven briefing on Sweetheart BESS — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.