Wolf Bone North Energy Center (ERCOT-29INR0162) — Project Summary

Queue ID
ERCOT-29INR0162
Capacity
1204 MW
Technology
Gas
Status
withdrawn
Location
Reeves, TX
Region
ERCOT
Developer
NRG Wolf Bone Energy Center LLC
IA Status
Facility Study

Wolf Bone North Energy Center

ERCOT-29INR0162BetaWithdrawnGasERCOTLBNL + Live

1,204 MW generation in Reeves, TX · In queue since October 2025 · Proposed COD November 2029

Withdrawn from the ERCOT queue in September 2026, according to ERCOT's queue (Oct 2026).

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

1,204 MW

Capacity

1

Components

Gas

1y 1m

In Queue

Facility Study

IA Phase

COD target: 2029

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 1m

Queue EntryOct 21, 2025

Interconnection request submitted to ISO/RTO

Interconnection Study

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Commercial Operation

Proposed COD: 2029-11-01

WithdrawnWithdrawn

Project withdrew from interconnection queue

Queue history
29INR0162 · 12 monthly ERCOT reports, Sep 2025 – Aug 2026

Projected COD moved

0 times

Nov 2029 → Nov 2029

Net change

0 months

first report to latest

Capacity

1204 MW

unchanged in the reports

Latest stage

Cancelled

last listed Aug 2026

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedOct 21, 2025
CancelledSep 4, 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
Nov 1, 2029
From queue filing
Developer in saved assessment
NRG Energy
Filed as NRG Wolf Bone Energy Center LLC
Status at research time
Active
Active — early-stage development in Facility Study phase, no construction timeline announced
Financing
Not recorded

Milestones in this assessment

IA executedOct 2025Latest in this assessment

Entered ERCOT interconnection queue, Facility Study phase initiated

Research sources and reasoning (0 recorded sources)

low confidence at research time

No source list recorded with this assessment.

Commercial operation date: Only LBNL queue data available with proposed COD of November 2029. No independent news or press releases found to validate or contradict this target date.

Developer: LBNL filing entity 'NRG Wolf Bone Energy Center LLC' is a project-specific LLC. The parent operating company is NRG Energy, a major independent power producer with extensive Texas generation assets.

Status: LBNL status shows 'active' with Facility Study phase initiated in October 2025. No public announcements or milestones found beyond queue filing.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Wolf Bone North Energy Center is a proposed 1204 MW gas-fired combined-cycle generation project located in Reeves County, Texas. Developed by NRG Wolf Bone Energy Center LLC, the project is listed in the ERCOT interconnection queue as entry ERCOT-29INR0162, with a queue entry date of October 21, 2025. The proposed commercial operation date is November 1, 2029.

The project's point of interconnection (POI) is at the Tap 345 kV 60404 SOLTICE7A - 18669 TOYAHCRK_5 Ckt 1 and Ckt 2. The project is currently listed as active in the interconnection queue.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Aug 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Reeves

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

NRG Wolf Bone Energy Center LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

Tap 345 kV 60404 SOLTICE7A - 18669 TOYAHCRK_5 Ckt 1 Tap 345 kV 60404 SOLTICE7A - 18669 TOYAHCRK_5 Ckt 2

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_WEST
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.