NRG Prairie Energy Center
1,253 MW generation in Hill, TX · In queue since April 2026 · Proposed COD December 2030
1,253 MW
Capacity
0
Components
7 months
In Queue
—
IA Status
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
4y 8m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-31
Projected COD moved
0 times
Dec 2030 → Dec 2030
Net change
0 months
first report to latest
Capacity
1253 MW
unchanged in the reports
Latest stage
Screening started
in ERCOT's latest report
Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
medium confidence at research time
- einpresswire.com/article/947965376/tceq-issues-preliminary-decision-on-nrg-air-permit-for-maypearl-area-1-2-gw-data-center-power-plant
- datacenters.cutrerlabs.com/intel/2026-10-nrg-prairie-energy-center-tceq-preliminary-decision/
- interconnection.fyi/project/ercot-29inr0158
- cleanview.co/power-projects/planned/natural-gas-power-plants/texas/29INR0158/nrg-prairie-energy-center-
- ercotqueue.com/project/29INR0158
- gem.wiki/Prairie_Energy_Center
Commercial operation date: Only the ERCOT/LBNL filing gives a date (proposed COD 2030-12-31). The aggregators (Cleanview 'Expected online 2030', interconnection.fyi) repeat that filing and are not independent. No developer press release or financing-backed target was found.
Developer: The queue filer is the project LLC 'NRG Prairie Energy Center LLC'. Coverage of the TCEQ air permit refers to it as 'NRG's 1.2 GW Prairie Energy Center', which points to NRG as the operating parent. No ownership change was found.
Status: The LBNL status 'active' is consistent with the no-IA, pre-construction picture in the Global Energy Monitor, ercotqueue.com and permit coverage. The interxdata 'operational' label contradicts LBNL (is_operational=false) and every other source, so I disregarded it.
About
Generated Oct 25, 2026
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The NRG Prairie Energy Center is a proposed natural gas-fired combined-cycle generation project located in Hill County, Texas. Developed by NRG Prairie Energy Center LLC, the project has a total proposed capacity of 1,253 MW. It is planned to interconnect to the transmission system at a tap on the 345 kV line between the #1907 Venus Switch and the #3389 Fort Smith Switch.
The development project is listed in the interconnection queue of the Electric Reliability Council of Texas (ERCOT) under queue ID ERCOT-29INR0158. It entered the queue on April 2, 2026, and its status is currently active. The project's proposed commercial operation date is December 31, 2030.
Summary provenance
Summary generated Oct 25, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- ERCOT queue source as of: Oct 1, 2026.
- Queue history observations through: Sep 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
TX
County
Hill
Grid Region
ERCOT (Texas)
Market
ISO/RTO Member
Developer
NRG Prairie Energy Center LLC
Utility
—
Entity
ERCOT
Service Type
—
Point of Interconnection
Tap #1907 Venus Switch – #3389 Fort Smith Switch 345 kV
Data Source
Live · ERCOT
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- ERCOT
- Trading Hub
- HB_NORTH
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
TOCE TX BESS 2
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Texas energy overview
Summary analysis with parallel narrative sections and visualizations.
State-by-state breakdown for ERCOT (Texas)
Summary analysis with parallel narrative sections and visualizations.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.